background image

 

 

 

 

 

Questions and Answers 

 

 

 
 

6045 Cochran Rd, Cleveland, OH 44139 

USA  |  Tel 440.248.9300  |  

Fax 440.349.2307  |  

Email: 

[email protected]

  |  

www.flukebiomedical.com

 

Question:

 

How do I update the firmware in my VT305? 

Answer: 

To update firmware in the VT305 do the following:

 

1.  You will receive an update file (e.g. filename C0204000.S19) from  

Fluke Biomedical. 

2.  Remove the micro SD Card from the VT305 and insert the card into your PC. 
3.  Copy the update file onto the microSD Card. 
4.  Remove the micro SD Card from the PC. 
5.  Insert the micro SD Card back into the VT305. 
6.  Restart the device (power on the VT305). 
7.  The screen will show you the update’s progress  
8.  When the update is finished, the device will restart by itself. 

 

Question:

 

How do I ensure that I get the full battery-use-per-charge with VT305? 

Answer:  

The VT305 is optimized for battery use. Ensure that the battery is fully 
charged. The VT305 will operate on battery power for up to four hours of 
continuous use. Shorter battery life will be experienced when the VT305 is 
communicating with computer applications such as the browser-viewed 
configurator, etc. 

 

Question:

  

What do I do if I need to keep testing when I get a low battery indication on the 
VT305? 

Answer:  

The VT305 can be connected to mains power using the universal power 
adapter and the appropriate prong-set (matched to the mains power 
receptacle). The power adapter connects to the VT305 via the USB cable. 

 
 
 
 
 
 

 
Alternatively, if a computer is being used during testing or documentation, 
you can connect the VT305 directly to the computer via the USB cable. Both 
power and data exchange are provided. 

 

Question:

  

The screen size on the VT305 is very small.  What do I do if I need increased 
screen resolution? 

Answer:  

Use the VT305 with the Ansur VT Plug-In.  You can use either a ready-for-use 
test procedure or drag and drop one or more test elements from the Plug-In 
onto the test template workspace in the Ansur software authoring screen 
(see Ansur Executive Operators’ Manual for more information). 

 

 

Reviews: