Electrical Safety Analyzer
Performing Electrical Safety Tests
37
Performing Lead-to-Lead (Patient Auxiliary) Leakage
Tests
Note
The Lead-to-Lead (Patient Auxiliary) leakage test
is available when the IEC60601 or ANSI/AAMI
ES1-1993 standard is selected.
To measure the leakage current through each applied part
or lead and selected combination of lead connections (all
other or between two), press the softkey labeled
Lead to
Lead
from the Leakage Test main menu shown in
Figure 18. Figure 23 shows the electrical connections
between the Analyzer and the DUT during a Lead-to-Lead
(Patient Auxiliary) Leakage Current Test.
The Lead-to-Lead (Patient Auxiliary) Leakage test adds a
diagram of the applied parts connection posts to the
display, as shown in Figure 22. In the figure, the applied
parts post RA/R is shown above the other posts. This
indicates that the leakage measurement is being made
from RA/R to all others. To move to the next applied part
post, press
. The first post will appear inline with the
other posts while the LL/F post appears above all others.
This indicates the second leakage measurement is being
made from LL/F to all others. Continue pressing
or
to
move from one connection post to another and noting the
measured current in the display.
After each post is isolated individually, the Lead-to-Lead
(Patient Auxiliary) Leakage test measures current of three
different combinations of posts tied together: RA/R and
LL/F, RA/R and LA/L, or LL/F and LA/L.
fis107.png
Figure 22. Applied Parts Connection Posts Display
Within the Lead-to-Lead (Patient Auxiliary) Leakage test, a
number of fault measurements can be made. Pressing
switches the polarity of the mains voltage applied
to the Analyzer’s test receptacle between Normal, Off,
Reverse, and Off. Pressing
opens and closes the
neutral connection to the Analyzer’s test receptacle.
Pressing
opens and closes the earth or ground
connection to the Analyzer’s test receptacle.
Note
If there are more than five applied parts to
connect to the Analyzer, see Using the 1-to-10
Adapter later in this manual.
Summary of Contents for ESA612
Page 6: ......
Page 10: ...ESA612 Users Manual iv ...
Page 12: ...ESA612 Users Manual vi ...
Page 26: ...ESA612 Users Manual 12 fis113 png Figure 5 DUT Connections to the Analyzer ...
Page 40: ...ESA612 Users Manual 26 faw19 png Figure 15 Mains to Applied Parts Insulation Test Schematic ...
Page 66: ...ESA612 Users Manual 52 gtv32 png Figure 29 Differential Leakage Current Test Schematic ...
Page 68: ...ESA612 Users Manual 54 fis120 png Figure 30 1 to 10 Adapter Connections ...
Page 70: ...ESA612 Users Manual 56 fis121 png Figure 31 ECG Lead Connection with 1 to 10 Adapter ...
Page 74: ...ESA612 Users Manual 60 fis115 png Figure 34 ECG Monitor Connections ...
Page 88: ......