background image

CHAPTER 07

PAGE 4

EXTRA - FLUGZEUGBAU GmbH

SERVICE MANUAL  EXTRA 300L

PAGE DATE: 1. June 1995

07-20-00

SHORING

Shoring the Extra 300L is necessary, when the main landing

gear or the tail wheel has to be removed or installed.

07-20-01

Shoring the Front

1 Remove the fore access panels up to aft the main landing

gear as per Chapter 51-00-01.
2 Install a balance weight (3, Figure) at the tail as per

Chapter 07-10-01.

3 Hoist the aircraft by means of both engine hoisting points

(1).

C A U T I O N

Prevent damage of ventilation tubing, brake lines and

drains, when shoring the aircraft.

4 Shore the aircraft by means of two supports (2), which

are to put under the left and right bottom longeron each

in the area behind the landing gear as shown in Figure 2.

This is possible also, when the landing gear is installed.

W A R N I N G

Maintain hoisting strap as a security device to prevent

nose over of the aircraft during maintenance work.

Shoring the Front

Figure 2

PAGE DATE: 1. June 1996

Reviews: