GB
20
Machine part
Action
Before
every use
After
Each Use
After 10
hours of
opera-
tion
Complete Machine Check the condition, replace dam-
aged parts if required
Accessible screws
and nuts
Retighten
Sprocket chain
wheel
(
23)
Check, replace if required
Saw chain (
1)
Check, regrind or replace if re-
quired
Clean (also oil after a longer peri-
od out of use)
Guide bar (
2)
Check
Clean (also oil after a longer peri-
od out of use)
Turn round
Oiltank
Check, fill up chain oil if required
Maintenance Interval Table
Regularly carry out the maintenance operations listed in the following table. The life of
the saw is extended by regular maintenance of your chainsaw. Furthermore, you get
optimum cutting performance and avoid accidents.
Summary of Contents for FHE 710 A1
Page 64: ...64...
Page 130: ...2 4 5 28 27 9 8 13 10 12 9 11 17 17b 17a 20 1 2 1 4 4 5 6 24 25 26...