-
5
-
INSTALLING QS200 METER INTO AN EXISTING TEE INSTALLATION (continued)
Figure 11
Install New QS200 Insert FLOMEC Multi-Tool
PIN HOLE ALIGNMENT
- For easy pin install
CLEAN LID GROOVE -
Remove dirt, roots, debris
Figure 10
Remove Old Insert From Tee with FLOMEC Multi-Tool
PRY UP - To break a stuck insert loose
LEVERAGE - To Lift
insert up and out
DRIVING WEDGE - To lift insert more