INSTALLING RAIL SYSTEM PARTS (Fiberglass Basin) Discharge Elbow Base, 

Discharge Piping and Guide Rails:

  

1.   Determine proper length required for discharge piping. 

2.   Connect discharge piping to elbow base.

3. 

Lower the discharge piping/elbow base assembly into the basin.

4. 

Position the elbow base by dropping a plumb line from the center of the guide  

 

rail pins located on the upper guide rail bracket to the center of guide rail pins  

 

protruding from the elbow base. Level the elbow base flange in two directions  

 

90° to each other.

5. 

Cut the 1’’ pipe guide rails (supplied by others) to the proper length and install  

 

them between the pins of the upper guide rail bracket and the pins on the elbow  

 

base. It is recommended that the guide rails are to be 1’’ schedule 40, galva- 

 

nized or stainless steel pipe. 

ATTACHING MOUNTING PLATE TO PUMP

  

1. De

termine if mounting adapter flange (included) is required for proper assembly.

2. 

Position mounting plate against pump discharge flange or (if required) sandwich  

 

mounting adapter flange between mounting plate and pump discharge flange.

3. 

Secure mounting plate to pump with screws and washers. Tighten securely. 

INSTALLING PUMP AND DISCONNECT

 

Position pump so the guide rails are captured by the mo unting plate. Slowly lower the 

pump down the guide rails to the base. 

If the pump is supported from beneath with concrete blocks or extended legs on the 

pump base, make certain the mounting plate is sufficiently compressed for sealing. 

The cantilevered weight of the pump is required for compressing and sealing the ma-

chined faces between the mounting plate the elbow base. 

After lowering the pump down the guide rail, secure the upper end of the lifting cable 

where convenient, to prevent the cable from falling into the basin.

9. SLIdE RAIL COUPLINg

7

I.O.M - SUBMERSIBLES - LBV SERIES

Summary of Contents for LBV 215

Page 1: ...SINCE 1981 www flofab com 001 iom 2017 lbv Operation Maintenance Installation Manual Submersible Pumps Series LBV Series LBV 40 75 215 315...

Page 2: ...nufacturer of shell and tube type heat exchangers The after sales services sales engineering R D production quality control accounting and administra tion departments of all the above companies share...

Page 3: ...atically trips off in a few seconds if there is any abnormality Please resume the operation after clearing the trouble and leave the pump as it is 2 2 Please consult your local dealer or company from...

Page 4: ...SINCE 1981 2 5 TROUBLE SHOOTING To prevent serious accidents disconnect the power supply before inspecting the pump I O M SUBMERSIBLES LBV SERIES...

Page 5: ...easons of the problem please consult the authorized local dealer or company from which the pump was purchased The pump has a 1 year warranty from the invoice date Invoice is required for any warranty...

Page 6: ...SINCE 1981 4 8 PARTS LIST LBV40 LBV75 I O M SUBMERSIBLES LBV SERIES...

Page 7: ...SINCE 1981 8 PARTS LIST LBV215 LBV315 5 I O M SUBMERSIBLES LBV SERIES...

Page 8: ...d be used to aid in pump installation and removal It is not necessary to use a separate pull chain on the mounting plate which is bolted to the pump discharge flange UPPER GUIDE RAIL SUPPORT BRACKET A...

Page 9: ...CHING MOUNTING PLATE TO PUMP 1 Determine if mounting adapter flange included is required for proper assembly 2 Position mounting plate against pump discharge flange or if required sandwich mounting ad...

Page 10: ...SINCE 1981 9 Slide Rail Coupling 8 I O M SUBMERSIBLES LBV SERIES...

Page 11: ...SINCE 1981 if required 9 I O M SUBMERSIBLES LBV SERIES...

Page 12: ...SINCE 1981 13...

Page 13: ...SINCE 1981 14...

Page 14: ...621 4995 Lake Worth Florida USA 33467 5749 Toronto Canada Tel 1 647 544 2995 www flofab com SERVICE 24 7 parts flofab com 250 N 10th Avenue North 250 N 10th St Brooklyn NY USA EvoloS Tower 121 de la...

Reviews: