Floe PWC1300 Quick Start Quide Download Page 4

Fig. 1A

3/8" x 3/4"

Plastic end caps

Fig. 1B

Fig. 1B

3/8" x 2" bolt

Slide clamp tight

against locating plate

Side Frame

Side Frame

Rear Frame

Beam

8"

Fig. 1A

Beam

Front Frame

Adjusting bolt

Rear Frame Beam

Front Frame Beam

against locating plate

Slide clamp tight

Leveling Leg

Step 1

Unscrew 3/8" x 3/4" bolt from leveling legs.
Lay side frames on side.  Insert leveling
legs into corner posts making sure the nut

track lines up with lower hole in corner post.

Line up the nut and washer with the hole in

corner post and fasten with 3/8" x 3/4" bolt

that were removed from leveling legs.  Leave

leveling leg extended out 8".  See Fig. 1 Torque

to 40 ft. lbs.

Clamp front and rear frame beams to side

frames using 3/8" x 2" bolts and nylock nuts.
Torque to 40 ft. lbs.  Frame beams to be

located as shown in Fig. 1A and 1B.

Fig. 1

Sheet 4 of 8

Be sure that the drainage holes in the

frame beams are on the bottom at
time of installation.

IMPORTANT NOTE:

Reviews: