9
DC WINCH INSTALLATION
ATTACH DC WINCH ASSEMBLY TO CORNER POST WITH ½” x 1 ¼”
BOLT AND ½” NYLOCK NUT (INCLUDED WITH LIFT FRAME
HARDWARE) (FIGURE 1.4).
TORQUE NUT TO 20 FT-LBS (FIGURE 1.5).
RE-INSTALL BOLT, WASHERS, NUT, AND ROLLER INTO BRACKET
WITH WINCH CABLE BETWEEN ROLLER AND BRACKET (FIGURE
1.6).
FIGURE 1.4
FIGURE 1.5
FIGURE 1.6
Summary of Contents for 511-11329-00
Page 12: ...12...