
Step 4 - Wall Assembly
1. Wall Brackets supplied x 2 Units
2. Each Wall bracket has 5x Holes - Used for connecting the rods
3. Each Wall Bracket has 2x Holes - Used for connecting bracket to the wall
Connecting:
1. Decide the wanted height of the bottom of the display i.e. bottom wall bracket
2. Using a spirit level and a pencil hold bracket to wall and mark the 2x holes
3. Drill and raw-plug 2x holes, now secure bottom wall bracket to the wall
4. Now using a plumb-line, lightly mark 2x pencil marks up your wall
5. Assistant Required - Place first frame into first hole of bottom bracket
6. Now place the top bracket over the top of frame & first hole
7. Leave a space so the frame can be lifted upwards to remove in the future
8. Using a spirit level, lightly mark with a pencil underneath the top bracket
9. Now repeat step 3 - You should now have 2x wall brackets connected
Image 1
Image 2
Image 3
Step 5 - Completed Display
1. When all completed
2. You should have this all assembled >>>>
Step 6 - Adding Documents
1. Slightly bend forward the acrylic
2. Best to place documents back-to-back
3. Now slide document's) into acrylic