7
4
8
2
3
2
4
4
1
2
2
2
5
2
6
4
C
D
M8×35mm
ST4
.
2x16mm
52
16
B
10
9
2
Install the connecting beam(3) use
5*5 wrench(A) to tighten the screws.
A
5x5
Use 5*5 wrench(A)
to tighten the screws
1
2
3
Install the connecting
beam(3)
3
C
x16
A
5x5
Install the supporting beam(5) use 5*5
wrench(A) to tighten the screws(C).
10
2
A
C
5
1
2
A
C
6
6
Install the supporting plate(6) use
5*5 wrench(A) to tighten the screws(C).
1
2
E
M6X16mm
8
1
Wrench
4x4mm
A
Wrench
5x5mm
Screen fixing base
11
4
1
ST4
.
8x16mm
Square spacer
12
12
10
2
2
3
5
6
7
8
9
11
11
12
10
4
Power port
AC
H S M1 M2
Connect all the cables onto the control box(8).
1
2
8
9
10
4
Item
No
.:
ET203H
Installation guide
Technical data
Max Loading capacity
125KG
Height range
Length range
600-1230mm
1100-1800mm
Column qty
3
Max Speed
38mm
/
s
Temperature
Certification
0
-
40°C
CE
FCC CUL
Input Voltage
100
-
240V
Frequency
continuous operation for 2 mins at most after pause for 18 mins
A
ccessory list
Attention: The drawings below are only for reference which might be
slightly different from the actual object, please in kind prevail. Any
tools missing or installation problems, please contact the customer
service firstly.
No.
Image
Spec
Qty
Component list
No
.
Part
Qty
No
.
Part
Qty No
.
Part
Qty
No
.
Part
Qty
No
.
Part
Qty
No
.
Part
Qty No
.
Part
Qty
No
.
Part
Qty
No
.
Part
Qty
No
.
Part
Qty No
.
Part
Qty
No
.
Part
Qty
C
able management
S
upporting plate
Supporting beam
Left Lifting Column
C
ontrol box
Handswitch
P
ower cable
Right Lifting Column
Connecting beam
Cover
Step 1
Step
2
Step 3
Handswitch
Port for cable
connected to
the lifting
column