background image

7

4

8

2

3

2

4

4

1

2

2

2

5

2

6

4

C

D

M8×35mm

ST4

.

2x16mm

52

16

B

10

9

2

Install  the  connecting  beam(3)  use 
5*5 wrench(A) to tighten the screws.

A

5x5

Use 5*5 wrench(A) 
to tighten the screws

1

2

3

Install the connecting 
beam(3)

3

C

x16

A

5x5

Install the supporting beam(5) use 5*5 
wrench(A) to tighten the screws(C).

10

2

A

C

5

1

2

A

C

6

6

Install the supporting plate(6) use 
5*5 wrench(A) to tighten the screws(C).

1

2

E

M6X16mm

8

1

Wrench
4x4mm

A

Wrench
5x5mm

Screen fixing base

11

4

1

ST4

.

8x16mm

Square spacer 

12

12

10

2

2

3

5

6

7

8

9

11

11

12

10

4

Power port

AC

H S M1 M2

Connect all the cables onto the control box(8).

1

2

8

9

10

4

Item

 

No

.:

ET203H

Installation guide

Technical data

Max Loading capacity

125KG

Height range

 

Length range

600-1230mm

1100-1800mm

Column qty

3

Max Speed

38mm

/

s

Temperature

Certification

0

-

40°C

CE

 

FCC CUL

Input Voltage

100

-

240V

Frequency

 

continuous operation for 2 mins at most after pause for 18 mins

A

ccessory list

Attention: The drawings below are only for reference which might be 
slightly different from the actual object, please in kind prevail. Any 
tools missing or installation problems, please contact the customer 
service firstly.

No.

Image

Spec

Qty

 Component list

No

.

Part

Qty

No

.

Part

Qty No

.

Part

Qty

No

.

Part

Qty

No

.

Part

Qty

No

.

Part

Qty No

.

Part

Qty

No

.

Part

Qty

No

.

Part

Qty

No

.

Part

Qty No

.

Part

Qty

No

.

Part

Qty

C

able management

S

upporting plate

Supporting beam

Left Lifting Column

C

ontrol box

Handswitch

P

ower cable

Right Lifting Column

Connecting beam

Cover

Step 1

Step

 2

Step 3

Handswitch

Port for cable 
connected to 
the lifting 
column

Reviews: