CONTENT
Content
1. Explanation of symbols
2. Device data
2.1.
Overview of types
2.2.1
Declaration of Conformity
2.2.2
Proper use
2.3
Installation instructions
2.4
Instructions for operation
2.5
Use of chemicals
2.6
Norms, regulations and standards
2.7
Tools, materials and auxiliary means
2.8
Minimum spacing and hazardous means
2.9
Product description
2.11
Scope of delivery
2.12
Type panel
2.13
Dimensions and technical data
3. Transport
4. Installing
4.1
Caution when installing
4.2
Distance
4.3
Disassembly of the front cover
4.4
Installation of the boiler
4.5
Introduction of hydraulic connectors
4.6
Filling and checking the installation
4.6.1
Filling the boiler with water and testing
4.6.2
Air discharging of the pump and unblocking
4.6.3
Discharge air from the boiler and installation
5. Electrical connector
5.1
Position of the entry for the introduction of the cable
5.2
Connecting the cable
5.3
Connection scheme
5.4
Power cable connection scheme
5.5
External control of the boiler (room thermostat)
6. Putting into operation
6.1
Before putting into operation
6.2
First putting into operation
6.3
Record on putting into operation
7. Handling operation of the heating regime and the preparation of sanitary water of heating
7.1
Instructions for operation
7.2
Overview of the setting elements
7.2.1
Functions of device
7.2.2
Basic settings
7.2.3
Heating regime
7.2.4
Symbols on the display
7.2.5
Symbols and warning codes
7.2.6
Symbols and error codes
7.3
Heating regulation
7.3.1
Regulator of room temperature
7.3.2
Cease of heating
7.4
Putting the boiler out of operation
7.5
Sanitary water preparation regime
7.6
Regime of heating and preparation of sanitary water
8. Cleaning and maintenance
9. Environmental protection and disposal into waste
10. Faults and their remedy
11. Instructions for designing