background image

Installation, Operation & Maintenance Guide

Style 79

DECOMMISSIONING EQUIPMENT

When decommissioning equipment it is important to ensure that the pump has been fully isolated from the
process and power sources for personnel safety. Pressure and fluid should be fully released before disassembly
of the equipment is to begin.

If the equipment has been used with toxic or hazardous fluids, ensure that it is
decontaminated and neutralized before decommission begins. There is often residual fluid
remaining from the draining process so consult the pump OEM for special cases.

REMOVING THE SEAL

Before opening the pump to remove the seal the warning stated above regarding toxins and
hazardous products must be reiterated. Make note of all fluids contained in the pump, drain
and decontaminate before opening the housing for seal service.

1

. Ensure all fluid has been drained and vented from both the pump and seal support system. Equipment

should be shut down and locked/tagged out according to OEM and plant specifications.

2

. Dismantle equipment sufficiently so that the gland plate and seal housing are exposed and accessible for

service. Disconnect the seal support system piping from the mechanical seal.

3

. Reset the setting clips that were saved from installation.

4

. Back-out the cup point set screws.

5

. Remove the gland bolts/nuts in an even manner.

6

. Carefully slide the seal out and off of the shaft.

If a part is going to be returned for service or to any third party, all shipments should have
appropriate safe-handling instructions securely attached to the package.

[FI/FO]

[BI]

[BO]

VERTICAL UP

Figure 9: Vertically oriented Style 79 layout with axial pumping ring

Page 7 of 7

Summary of Contents for Style 79

Page 1: ...ERS REPAIR SERVICE 1 Jackson Street Rua Java s 441 443 1719 South Sonny Avenue Essex Junction VT 05452 Bom Retiro Sao Paulo Gonzales LA 70737 Brazil CEP 01130 010 TEL 802 878 8307 TEL 55 11 3736 7373...

Page 2: ...maintenance must only be carried out by qualified personnel who have thoroughly read all instructions 3 The seal must only be used for its intended application Flex A Seal cannot be held liable for u...

Page 3: ...er face of rust burrs grit sharp edges and set screw damage using fine emery cloth Wipe clean Avoid making flat spots or reducing the shaft diameter 4 If the pump is equipped with a shaft sleeve verif...

Page 4: ...0 0015 0 003 in Fig 3 Radial bearing fit 0 002 0 003 in Fig 4 Bearing frame perpendicularity 0 0005 in in Fig 5 Axial shaft movement end play 0 005 in Fig 6 Seal chamber bore concentricity 0 005 in Fi...

Page 5: ...facing but clear of the seal chamber 6 Reassemble the pump as described by the pump OEM 7 If the gland is equipped with a gland gasket lubricate gland bolts and bolt the gland to the seal chamber usin...

Page 6: ...ection on the seal gland Figure 8 Piping should slope continuously upwards 1 2 in ft 40 mm m minimum with no relative high points that would result in trapped air in the tubing For shafts smaller than...

Page 7: ...E If leakage is detected it should be addressed as soon as possible to prevent hazards and protect personnel Leakage could come from a number of leak paths in the seal or be caused by changes in the p...

Page 8: ...luids contained in the pump drain and decontaminate before opening the housing for seal service 1 Ensure all fluid has been drained and vented from both the pump and seal support system Equipment shou...

Reviews: