Timeclock Regeneration Valves

In  normal  operation  the  Time  Of  Day  Display  will  be  viewed  at  all  times.  The  control  will  operate  normally  until  the
number  of  days  since  the  last  regeneration  reaches  the  Regeneration  Day  Override  setting.  Once  this  occurs,  a
regeneration cycle will then be initiated at the preset Regeneration Time.

Flow Meter Equipped Valves

In normal operation the Time Of Day Display will alternate being viewed with a Volume Remaining Display. This display
will be in gallons. As treated water is used, the Volume Remaining Display will count down from a maximum value to
zero  or  (----).  Once  this  occurs  a  regeneration  cycle  will  then  be  initiated  immediately  or  delayed  to  the  set
Regeneration Time. Water flow through the valve is indicated by the Flow Dot that will flash in a direct relationship to
flow rate. For Example:

Immediate Regeneration Valves With Days Between Regeneration Override Set

When  the  valve  reaches  its  set  Days  Since  Regeneration  Override  value  a  regeneration  cycle  will  be  initiated
immediately. This event occurs regardless of the Volume Remaining display having reached zero gallons.

Delayed Regeneration Valves With Days Between Regeneration Override Set

When  the  valve reaches its set Days Since Regeneration  Override value a  regeneration  cycle will be initiated at the
preset Regeneration Time. This event occurs regardless of the Volume Remaining display having reached zero gallons.

Control Operation During Regeneration 

In Regeneration the control will display a special 

Regeneration Display.

 In this display the control will show the current

regeneration  step  number  the  valve  is  advancing  to,  or  has  reached,  and  the  time  remaining  in  that  step.  The  step
number  displayed  will  flash  until  the  valve  has  completed  driving  to  this  regeneration  step  position.  Once  all
regeneration steps have been completed the valve will return to Service and resume normal operation. For Example: 

Pushing the Extra Cycle Button during a regeneration cycle will immediately advance the valve to the next cycle step
position and resume normal step timing.

C

ontrol Operation During Programming 

The  control  will  only  enter  the  Program  Mode  with  the  valve  in  Service.  While  in  the  Program  Mode  the  control  will
continue  to  operate  normally  monitoring  water  usage  and  keeping  all  displays  up  to  date.  Control  programming  is
stored in memory permanently. There is no need for battery backup power.

Control Operation During A Power Failure 

During  a  power  failure  all  control  displays  and  programming  will  be  stored  for  use  upon  power  re-application. 

The

control will retain these values for years, if necessary, without loss.

 The control will be fully inoperative and any calls for

regeneration will be delayed. The control will upon power re-application resume normal operation from the point were it
was interrupted. 

An indication that a power outage has occurred will be an inaccurate time of day display

.

Summary of Contents for 5600SE

Page 1: ...IMPORTANT Fill in pertinent information on page 2 for future reference MODEL 5600SE Upflow Brining Service Manual...

Page 2: ...n _____________________________________________________________ Page 2 Valve Programming Treated Water Capacity ______________________________ Gallons Liters Regeneration Day Override ________________...

Page 3: ...ing codes The pipe size for the drain should be a minimum of 1 2 Backwash flow rates in excess of 7 gpm or length in excess of 20 require 3 4 drain line 4 The 1 distributor tube 1 050 O D should be cu...

Page 4: ...or Down Set Button once to adjust Time Of Day Display by one digit Push and hold either Up or Down Set Button to adjust Time Of Day Display by several digits 1 Set Time Of Day 1 Push and hold for 5 s...

Page 5: ...ontrol programming is now complete Push the Extra Cycle Button This will exit the control from the Programming Mode and resume Normal Operation 1 The first option setting display that appears in the P...

Page 6: ...tely With Delayed Regeneration controls the Service Arrow will begin to flash immediately and a regeneration will occur at the present regeneration time i e 2 00 a m 2 Press and Hold for 5 seconds the...

Page 7: ...4 Optional With proper valve operation verified A Add water to the top of the air check Manually step the valve to the Brine Draw Position and allow the valve to draw water from the brine tank until...

Page 8: ...on Time This event occurs regardless of the Volume Remaining display having reached zero gallons Control Operation During Regeneration In Regeneration the control will display a special Regeneration D...

Page 9: ...Printed in U S A Page 9 MODEL 5600SE Upflow Water Conditioner Flow Diagrams Upflow Brining Using Yellow Cycle Cam Part No 24598 Service Position Backwash Position Regeneration Cycle Step 1...

Page 10: ...n U S A MODEL 5600SE Upflow Water Conditioner Flow Diagrams Upflow Brining Using Yellow Cycle Cam Part No 24598 Cont d Regeneration Cycle Step 2 Brine Slow Rinse Position Rapid Rinse Position Regenera...

Page 11: ...inted in U S A Page 11 MODEL 5600SE Upflow Water Conditioner Flow Diagrams Upflow Brining Using Yellow Cycle Cam Part No 24598 Cont d Regeneration Cycle Step 4 Brine Tank Fill Position Service Positio...

Page 12: ...Page 12 Printed in U S A MODEL 5600SE Upflow Water Conditioner Flow Diagrams Upflow Brining Using Red Cycle Cam Part No 17885 Service Position Brine Slow Rinse Position Regeneration Cycle Step 1...

Page 13: ...in U S A Page 13 MODEL 5600SE Upflow Water Conditioner Flow Diagrams Upflow Brining Using Red Cycle Cam Part No 17885 Backwash Position Regeneration Cycle Step 2 Rapid Rinse Position Regeneration Cycl...

Page 14: ...Page 14 Printed in U S A MODEL 5600SE Upflow Water Conditioner Flow Diagrams Upflow Brining Using Red Cycle Cam Part No 17885 Brine TankFill Position Regeneration Cycle Step 4 Service Position...

Page 15: ...U S A Page 15 MODEL 5600SE Upflow Valve Wiring Diagram CB1 5600SE Circuit Board VDM Valve Drive Motor EM Electronic Flow Meter Optional SW1 Homing Switch SW2 Step Switch HCAM Homing Cam UFSCAM Upflow...

Page 16: ...MODEL 5600SE Upflow Control Valve Assembly See opposite page for parts list 61 60 1 2 3 4 7 6 5 11 12 13 14 18 17 16 15 10 22 23 24 28 26 25 20 29 31 39 41 42 43 44 48 47 46 45 49 51 52 53 54 58 57 5...

Page 17: ...pecify Size 25 1 10227 Injector Screen 26 2 13301 O Ring Injector 28 1 13303 O Ring Injector Cover 29 1 13166 Injector Cover 31 2 13315 Screw 39 1 13245 BLFC Button Retainer 40 1 12977 O Ring 41 1 BLF...

Page 18: ...Page 18 Printed in U S A MODEL 5600SE Upflow Valve Powerhead Assembly See opposite page for parts list 19 20 26 3 24 23 2 1 4 6 7 5 9 10 11 12 13 14 8 14 18 17 16 15 25 21 22 24 14 28...

Page 19: ...PM 24V 50 60Hz 12 3 11384 Screw Motor 13 1 13229 Back Plate 14 4 13296 Screw Component 15 1 12037 Washer 16 1 18722 Cam Brine Valve 17 1 19674 Transformer 24V 9 6VA U S 120V 1 25651 Transformer 24V 9...

Page 20: ...y Parts List Item No Quantity Part No Description 1 2 13314 Screw Hex Washer 8 18 x 5 8 2 2 19569 Clip Flow Meter 3 1 19797 Meter Body Assembly 3 4 Turbine 4 4 13305 O Ring 119 5 1 19791 01 Harness As...

Page 21: ...A 1 17820 Plug By Pass Inlet 5B 1 17820 01 Plug By Pass Outlet White 6 4 18661 O Ring 218 7 2 18662 Retaining Ring 8 2 18660 O Ring 9 2 13305 O Ring 119 10 2 13255 Clip Mounting 11 2 13314 Screw Hex W...

Page 22: ...ass Valve Body 3 4 1 17290NP By Pass Valve Body 3 4 Nickel Plate 1 13399 By Pass Valve Body 1 1 13399NP By Pass Valve Body 1 Nickel Plate 2 1 11726 Seal By Pass 3 1 11972 Plug By Pass 4 1 11978 Side C...

Page 23: ...2300 Safety Brine Valve Body 2 1 10138 Ball 3 8 3 1 11566 Bull Stop 4 1 10328 Elbow 1 4 x 1 4 T 5 2 10332 Insert 3 8 6 2 10330 Sleeve 3 8 7 2 10329 Tube Nut 3 8 8 1 10186 Nut Hex 10 32 Nylon 9 1 60002...

Page 24: ...Page 24 Printed in U S A MODEL 5600SE Upflow 2310 Safety Brine Valve See Opposite Page for Parts List...

Page 25: ...ve Arm Assembly 3 1 19804 Stud 10 24 4 1 19805 Nut 10 24 5 1 19652 01 Poppet Seal 6 1 19649 Flow Dispenser 7 1 11183 O Ring 017 8 1 19647 Elbow Safety Brine Valve 9 2 19625 Nut Assembly 3 8 10 1 18312...

Page 26: ...s or inlet valving to normal service position Water pressure should now be applied to the conditioner and any by pass line shut off 11 Check for leaks at all seal areas Check drain seal with the contr...

Page 27: ...holding signal wire from meter dome 3 Remove two screws and clips at by pass valve or yoke Pull resin tank away from plumbing connections 4 Remove two screws and clips at control valve Pull meter mod...

Page 28: ...ted Flushings of the Hot Water Tank is Required F Make Sure Distributor Tube is not Cracked Check O Ring and Tube Pilot G Replace Seals and Spacers and or Piston H Remove obstruction from flow meter I...

Page 29: ...Control is Plugged B Injector is Plugged C Injector Screen Plugged D Line Pressure is too Low E Internal Control Leak F Improper Programming G Timer not Operating Properly A Clean Drain Line Flow Con...

Page 30: ...1 14309 Piston Rod Retainer 1 13001 03 Piston Rod Assembly 1 15561 End Plug Assy White 1 18848 Piston Upflow 60125 5600SE Seal and Spacer Kit For Illustration and Parts List See Pages 16 and 17 5 1324...

Page 31: ......

Page 32: ...P N 19746 Rev 4 04 01...

Reviews: