flamco Meibes A1CX Series Technical Information For Installation And Operation Download Page 20

20

8. Recommended aftercare (Network)

It is recommended that a regime of periodic inspection of the system be undertaken. The inspection shall take the form of:

Visual inspection

System visual inspection, exterior corrosion, water stains on the pipe work and equipment, suggesting a slow leak and 

make up water entering the system thereby diluting the inhibitor concentrations.

Water Samples

Water samples shall be drawn from a suitable draw off point to ascertain the condition of the network, on the primary side 

water.

The analysis of the water should include:

•  Visual assessment – Note any discolouration away from clear as an indicator of possible corrosion

•  Chemical assessment – PH value, hardness, precipitate composition and concentration of chemical treatment and type of 

treatment contained within the water (A UKAS registered lab is recommended to be used in the system water analysis).

8. Appendix C

Summary of Contents for Meibes A1CX Series

Page 1: ...cal information for installation and operation Meibes Heat Interface Unit HIU A1CX Series Installation in conjunction with a pre plumbed unvented cylinder Standard Unit 20 kW High Pressure Unit 20 kW...

Page 2: ...ulic Primary Circuit 8 3 4 2 Hydraulic Secondary Circuit 9 3 5 Electrical Connections 9 3 5 1 Electrical Diagram for wiring centre fitted at the pre plumbed unvented cylinder 9 3 5 2 HIU Heating Circu...

Page 3: ...tions for working on the system and system parameters Disconnect the system from the mains and monitor it to ensure that no voltage is being supplied e g at the separate cut out or a main switch Secur...

Page 4: ...ith the relevant building regulations Please be aware that the unit weighs approximately 15 kg and as such should be handled in accordance with health and safety guidelines and regulations The unit sh...

Page 5: ...linder 2 1 Product Usage This product is to be installed by trained installers only Please follow the safety instructions as well as all applicable technical regulations These instructions are aimed e...

Page 6: ...l valves not illustrated Spool piece for solenoid valve 3 4 x110mm removable 9 Return temperature limiting valve RTL Factory locked to 40 C Standard Unit to 60 C High Pressure Unit Connections A Prima...

Page 7: ...differential pressure p1 Depending to lowest value of components Secondary max pressure 6 bar 10 bar Fittings Primary side Zone Valve Fitted with electrical actuator head max differential pressure 10...

Page 8: ...ottom The wall needs to be strong enough to support the unit If the wall is of drywall construction make sure that there is a supporting board e g 18mm ply wood installed to the supporting structure w...

Page 9: ...TG 2 PORT DHW CUTOUT COMBINED STAT WIRING CENTRE 5A SUPPLY ROOM STAT PROGRAMMER BOILER O C 1 1 2 2 L N 3 3 4 4 1 2 3 4 L N SL HTG ON DHW ON DHW OFF MV Bl Br L L PUMP N N 2 3 2 5 5 6 6 7 7 8 8 9 9 10 1...

Page 10: ...evels are never exceeded if premature pitting corrosion is to be avoided Any treatment or cleaning should only be carried out by competent organisations that have the experience and technical resource...

Page 11: ...ermostat and push the override button on the timer to get a call for heat This will activate the HIU delivering heat to the radiators and or the DHW circuit Make sure that at least one TRV on a radiat...

Page 12: ...tion dependet The Table shows the list of error codes which might be shown on the display E 7 is the general error that is shown when the HIU has not been filled air in flow sensor For further informa...

Page 13: ...ex DN15 DN20 The DPCV fitted in the primary circuit of the HIU ensures that the pressure loss of the unit doesn t exceed DN15 13 5 kPa DN 20 40 kPa factory setting The valve itself is installed in the...

Page 14: ...ew driver 1 2 Remove the thermostatic head from the valve body 3 Select the temperature by turning the head until the index is pointing at 40 C To lock the head align the two metal pins with the marks...

Page 15: ...t one TRV on a radiator or underfloor heating circuit is open It will take some minutes to start heating the apartment but the response of the unit can be checked immediately by measuring the temperat...

Page 16: ...mThermostat Wiring Centre of Unvented Pre plumbed Cylinder ActuatorHead inHIU WiringCentre Fuse nonswitched 5A Heat Meter M Bus Pulse Pulse Inputs Pulse Output Pulse Module M Bus Module 24 25 01 24 25...

Page 17: ...kept to a minimum post handover We are not specialists in the design installation and or cleaning and subsequent treatment of water systems but nevertheless contained in the sections below are importa...

Page 18: ...early involvement prior to treatment as to the correct application and chemical to use 3 Refurbishment and Improvement to existing systems It is vitally important that before commencing works on exis...

Page 19: ...n a neutral PH Chemicals shall be of a type suitable for disposal through a conventional sewer or foul drain i e no requirement for tankering or specialist disposal Neutralisation 6 Site installation...

Page 20: ...inhibitor concentrations Water Samples Water samples shall be drawn from a suitable draw off point to ascertain the condition of the network on the primary side water The analysis of the water should...

Page 21: ...AI 80597 550 AI_80597 563 10 Insulated Corrugated Steel Pipe 17cm AI B 46123 17 11 Insulated Corrugated Steel Pipe 20cm AI B 46123 20 12 Full Case with window 400 x 180 x 510 AI 10203 459 13 Case wit...

Page 22: ...22 Notes...

Page 23: ...23 United Kingdom Flamco Limited Washway Lane St Helens Merseyside WA10 6PB United Kingdom 44 1744 744 744 info flamco co uk www flamco co uk Contact...

Page 24: ...2_01 2019_eng AICX I O Manual Subject to modifications Flamco Limited Washway Lane WA10 6PB St Helens Merseyside United Kingdom T 44 17 447 447 44 F 44 17 447 447 00 E info flamco co uk I www flamcogr...

Reviews: