Connection of the water-cooled condenser

Cooling units equipped with a KD-W water-cooled
condenser (see unit specification) must be connected to
a mains water supply having a minimum pressure of 0.5
bar and a maximum pressure of 10 bar. Use an appropri-
ate coupling for connecting the mains water supply (see
pipe connection instructions on the cooling unit).
Follow the arrows carefully. If heat is recovered, the
drain water must be connected to an accumulator tank.

Important!

Check list
– Always study the safety directions

on page 2 before beginning all work!

– The air handling unit must not be

commissioned until the installation
had been inspected according to the
check list below!

Before

commissioning check the

following:
– Condition on delivery - no transport

damage, installation site, (adequate
lighting, supporting surface etc.)

– No leakage of compressor oil
– Follow-up tightening of the Rotalock

connection

– Phase sequence and retightening of

the power supply connection

– Cooling control signal from the air

handling unit

– Cooling energy recovery not enabled
– Crankcase heater is operating
– Condensate drainage, cooling instal-

lation report submitted

– There are no loss cables

After

commissioning check the

following:
– outdoor-/suppllyair temperature
– condensation-/evaporating
– hot gas temperature/

subcooling/overheating

– operating currents
– information to staff-performed.

In a cooling unit with KD-W water-cooled condenser,
the mains water supply must not be shut off.

To start the cooling unit

If the cooling unit is commissioned in cold weather, i.e.
when the temperature is below +15 °C, the compressors
must be pre-heated: Set the protective motor switch of the
compressors to position 0 (Off). Set the main switch insi-
de the cooling unit to position 1 (On) and activate the
control circuit fuse. The crank case heater now heats up
the compressor. If the ambient temperature is below +15
°C, wait for 4-8 hours until the compressor has become
warm, before you start up the compressors.

To set the setpoint for cooling

When cooling is required, the controller in the air
handling unit transmits a control signal (0 – 10V) to the
cooling unit which switches in the capacity steps in
proportion to the signal.

Performance check

The performance of the cooling unit can be tested by
temporarily lowering the cooling setpoint to the point
that the cooling unit starts up.

Inspection

For a description of the control unit, see page 9. The
control function of the air handling unit should include
a minimum temperature sensor in the supply air located
as far as possible from the air handling unit, and a room
or extract air sensor. The cooling unit should be inter-
locked across the extract air fan (and also an outdoor
thermostat). It is important that the compressors stop if
the extract air fan stops. Due to the location of the con-
denser coil, so-called cooling energy recovery cannot be
utilized at the same time as the cooling unit is in operation.

High pressure condenser, KD

If condenser heat cannot be emitted into the extract air,
KM1 (“Capac.Control”) will first be automatically swit-
ched off, however if this is insufficient, the high pressure
switch will open and must be manually reset, (see page 9).

Alarm

All the alarms are indicated on the display of the
control unit (see page 10). Potential-free closure is on
the wiring terminal for group alarm transmission, if
required.

Important!

If the unit is installed outdoors, the
heat carrier must contain an appro-
priate mixture of anti-freeze agent to
suit the climate.

Important!

If anti-freeze agent is used, the unit
must have a closed system for the heat
carrier.

Summary of Contents for EQKA

Page 1: ... Connections 3 Installation and Commissioning 4 Operation and Care 5 Use 6 Maintenance 7 Troubleshooting 8 Refrigeration Flow Chart 9 Docking 10 EQKA Cooling unit Fläkt Woods 8643 GB 2012 11 1 We reserve the right to alter specifications Installation and Maintenance Instructions ...

Page 2: ...ied out by a professional Service maintenance of the cooling system must only be carried out by an accredited company and qualified personnel wearing required protective equipment gloves and protective eye glasses Automatic start Open and lock the main switch of the cooling unit before beginning any work on the unit Do NOT stand on the cooling unit Use only genuine spare parts for maintenance Negl...

Page 3: ... air handling unit or another unit acrossamonitoringunit This alarm group can be obtained as potential free contacts at pins 57 and 58 on wiring terminals To prevent unnecessary stops and alarm from the cooling unit it should be interlocked across the extract air fan FF Connect the cooling unit as illustrated in the wiring diagram below Incoming 3x400V supply To be connected to main switch in cool...

Page 4: ...pre heated Settheprotectivemotorswitchofthe compressors to position 0 Off Set the main switch insi de the cooling unit to position 1 On and activate the control circuit fuse The crank case heater now heats up the compressor If the ambient temperature is below 15 C wait for 4 8 hours until the compressor has become warm before you start up the compressors To set the setpoint for cooling When coolin...

Page 5: ...t fuse Protective motor switch Control unit with display Refrigerant tank Component description Control unit RC1 The control unit is located in the door of the cubicle See the description on page 9 Control circuit fuse To reset the miniature circuit breaker pull the black actuator button upward Main switch Use the main switch for switching the cooling unit on off Always switch off the main switch ...

Page 6: ...ls Cooling unit with hot gas bypass On a 20 control signal the ICM2 with hot gas valve starts in the fully open position The hot gas valve closes linearly between 2 and 8 V The KMI starts at 8 V and the valve opens 40 Between 8 and 10 V the valve closes again Stepping levels Stepping out of each step occurs 20 2 0V during stepping level for 2 or 3 compressors and 10 1 0v During the stepping level ...

Page 7: ...as 4 Safety equipment tripping function on the pressure switches 5 Cooling capacity 6 Control feedback control equipment Performance check 7 Electric equipment retightening of power supply connections 8 Cleaning Coils drip tray drainage 9 Air filter Recurring checks Mustonlybecarriedoutbyarefrigerationservicecompany Inspect the system at least once every 12 months and main tainajournal Checkthefol...

Page 8: ...et it or let the com pressor motor cool off Check after resetting the motor protection that the compressor operates without abnormal noise High pressure switch with automatic reset has tripped and compressor 1 is switched off for 5 min Check that filter and coils are not clogged Check that the control signal is at least 30 for start of first com pressor To start all the compressors the signal shou...

Page 9: ...high pressure GP1a 1 In service pressure switch high pressure GP2 1 GP2 2 GP2 3 Protective pressure switch low pressure KD 1 KD 2 KD 3 Condenser KD W Water cooled condenser optional KM 1 KM 2 KM 3 Compressor MU1 1 MU1 2 MU1 3 Measurement tapping high pressure MU2 1 MU2 2 MU2 3 Measurement tapping low pressure SG 1 SG 2 SG 3 Sight glass SÄV Safety valve VS 1 VS 2 VS 3 Expansion valve VW Pressure co...

Page 10: ...Fläkt Woods 8643 GB 2012 11 10 We reserve the right to alter specifications Installation and Maintenance Instructions EQKA Cooling unit Jointing Externally Jointing Internally A C B D A B D C ...

Reviews: