background image

10

ASSEMBLY INSTRUCTIONS

NEEDS DIAGRAM IMAGE

STEP 5

1.  ASSEMBLE BUTTERFLY ARM (9,10) AND SUPPORT TUBE(8) WITH 2 BEARING(49) AND Ø12 

WASHER(36),TIGHTEN M12 NUT(37)

2.  ASSEMBLE THE BIG SPONGE(82) TO THE BUTTERFLY ARM(9,10) AND THE SQUARE END 

ISIDE CAP(80);HANDLE CAP(75)

3.  INSERT THE HANDLE BAR(11) TO THE BUTTERFLY ARM(9,10) FIXED WITH M8*20 BOLT(40)

AND Ø8 WASHER(44)

Summary of Contents for F4H-HG-7002

Page 1: ...tain important information which will help you get the best from your equipment and ensure safe and correct assembly use and maintenance If you need help or have damaged or missing parts call the Cust...

Page 2: ...st Exploded Diagram Assembly Instructions Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 Step 11 Step 12 Step 13 Step 14 Step 15 Step 16 Declaration 03 04 05 06 07 07 08 08 09...

Page 3: ...clothing that could become caught in the equipment Running or aerobic shoes are also required when using the equipment 7 Use the equipment only for its intended use as described in this manual DO NOT...

Page 4: ...18 SIDE VERTICAL TUBE DOWN 1 19 SIDE BASE TUBE 1 20 SIDE SUPPORT TUBE L 1 21 SIDE SUPPORT TUBE R 1 22 PEDDAL TUBE R 1 23 PEDAL TUBE LEFT 1 24 T BAR 1 25 LAT PULL BAR 1 26 BOLT M10X70L 21 27 BOLT M10X...

Page 5: ...69 50X50MM TUBE CAP 7 70 025 TUBE CAP 2 71 30X60 TUBE CAP 2 72 025 TUBE CAP 2 73 50X50 TYPE FOOT CAP 2 74 50X50 FOOT CAP 4 75 PVC HANDLE BAR HOUSING 8 76 025 TUBE CAP 4 77 HALF ROUND COVER 2 78 038X02...

Page 6: ...6 EXPLODED DRAWING...

Page 7: ...7 ASSEMBLY INSTRUCTIONS STEP 1 1 ASSEMBLE MAIN BASE TUBE 1 AND REAR BASE TUBE 2 WITH 2 X BOLT M10 70 26 4 X 10 WASHER 32 AND 2X M10 NUT 33 NEEDS DIAGRAM IMAGE...

Page 8: ...64 UNDER REAR BASE TUBE 3 WITH 2X M8 20 BOLT 40 AND 2X 8 WASHER 44 2 PUT DOWN WEIGHT PLATE 87 THROUGH WEIGHT SLIDER TUBE 4 3 ASSEMBLE TUBE HOUSING 62 AND WEIGHT PICK UP POLE 5 WITH PIN 58 INSERT INSID...

Page 9: ...0 BOLT 40 AND 2X 8 WASHER 44 FIXED THEM 2 ASSEMBLE TOP BRACE TUBE 7 AND MAIN SUPPORT TUBE 6 WITH 2XM10 70 BOLT 26 2X 10 WASHER 32 AND 2XM10 NUT 33 STEP 4 1 ASSEMBLE SUPPORT TUBE FOR BETTERFLY ARM 8 AN...

Page 10: ...M 9 10 AND SUPPORT TUBE 8 WITH 2 BEARING 49 AND 12 WASHER 36 TIGHTEN M12 NUT 37 2 ASSEMBLE THE BIG SPONGE 82 TO THE BUTTERFLY ARM 9 10 AND THE SQUARE END ISIDE CAP 80 HANDLE CAP 75 3 INSERT THE HANDLE...

Page 11: ...11 ASSEMBLY INSTRUCTIONS NEEDS DIAGRAM IMAGE STEP 6 1 ASSEMBLE THE PRESS PIN 54 AND MAIN SUPPORT TUBE 6 WITH M8 40BOLT 39 2 X 8 WASHER AND M8 NUT FIXED...

Page 12: ...AND MAIN SUPPORT TUBE 6 WITH 2XM10 70 BOLT 26 AND 4X 10 WASHER 32 2X M10 NUT 33 TIGHTEN 2 ASSEMBLE LEG DEVELOPER 14 AND SEAT TUBE 12 WITH M12 80 BOLT 35 2 12 WASHER 36 AND M12 NUT TIGHTEN 3 INSERT TH...

Page 13: ...RAM IMAGE STEP 8 1 FIXED THE SIDE BASE TUBE 19 AND MANI BASE TUBE 1 WITH 2 M10 70 BOLT 26 4 10 WASHER 32 AND 2 X M10 NUT 33 2 FIXED THE SIDE VERTICAL TUBE 18 AND SIDE BASE TUBE 19 WITH 2 M10 70 BOLT 2...

Page 14: ...EEDS DIAGRAM IMAGE STEP 9 1 INSERT THE SIDE VERTICAL TUBE UP INTO THE SIDE VERTICAL TUBE DOWN FIXED WITH 2X M10 60 BOLT 8 4 10 WASHER 32 AND 2 M10NUT 33 FIXED TOP BRACE TUBE 7 WITH 2PCSM10 70 26 4 10...

Page 15: ...0 1 ASSEMBLE THE SIDE SUPPORT TUBE L R 21 22 AND SIDE VERTICAL TUBE UP 17 WITH 2PCS M10 70 BOLT 26 4PCS 10 WSHER 32 AN2PCS M10 NUT 33 TIGHTEN 2 INSERT THE VERTICAL HANDLE BAR 75 INTO SIDE SUPPORT TUBE...

Page 16: ...BLE THE PEDAL SUPPORT TUBE L R AND SIDE VERTICAL TUBE 18 WITH WASHER 48 NYLON WASHER 78 CAP 77 AND M8 16 BOLT 42 TIGHTEN 2 FIXED THE SHOCK ABSORBER 52 SIDE VRTICAL TUBE 18 AND PEDAL SUPPORT TUBE 22 WI...

Page 17: ...41 AND 4PCS 8 WASHER 44 FIRST ASSEMBLE THE SEAT CUSHION 89 AND SEAT TUBE 12 WITH 2 M10BOLT 33 2 10WASHER 32 3 FIXED PREACHER PAD 90 AND SUPPORTING TUBE 15 WITH 2 M8 15BOLT 41 2 8WASHER 44 4 FIXED THE...

Page 18: ...BOLT 28 2 FIXED ONE END OF CABLE C AND BUTTERFLY ARM L 10 WITH M8 15 BOLT 41 M8 NUT 45 LET CABLE C GOES THROUGH SINGLE PULLLEY BRACKET 57 THEN DOUBLE PULLEY BRACKET 66 FIXED THEM WITH M10 40 BOLT M10...

Page 19: ...30 PULLEY B 67 AND TOP BRACE TUBE 7 WITH M10 45 BOLT AND M10 NUT LET CABLE A GOES THROUGH THE PULLEY OF MAIN SUPPORT TUBE 6 OVER PULLEY CONNECTING PLATE 55 GOES UP THROUGH THE PULLEY 66 ON THE TOP BRA...

Page 20: ...LY INSTRUCTIONS NEEDS DIAGRAM IMAGE STEP 15 1 LET CABLE B GOES THROUGH PULLEY OF LEG DEVELOPER FIRST AND THE PULLEY OF MAIN SUPPORT TUBE THEN GOES THROUGH AS SHOWN AS THE DRAWING CONNECTED WITH HOOK A...

Page 21: ...EEDS DIAGRAM IMAGE STEP 16 1 CONNECTED LAT PULL BAR 24 AND CABLE A 94 WITH HOOK 60 2 INSERT THE ROLL PAD TUBE THROUGH LEG DEVELOPER 14 PUT ON THE SMALL SPONGE 83 3 CONNECTED T BAR 25 AND CABLE B 95 WI...

Page 22: ...Gym Complies with the essential health and safety requirements of the following directive Direction for 2014 357 EU for Stationery training equipment EN ISO 20957 1 2013 EN ISO 20957 2 2005 Authorised...

Page 23: ...23...

Reviews: