FISNAR 710PT-U Operating Manual Download Page 3

 

710PT-U Pinch Tube Valve Operating Manual 

 

 

© 2020 Fisnar 

- 3 - 

710PT-U Rev 1 

PRODUCT DESCRIPTION                                                       710PT-U PINCH TUBE VALVE 
 
 
 
 
 

OPERATION PROCEDURE 
 
The valve will operate in any position, providing the supply source is  pressurized.  If gravity feed is 
being used, the inlet side of the valve must be in an upright, vertical position and the reservoir must 
always be six inches above the center line of the valve.  Gravity supply will work only with very thin 
pourable materials

. 

 

A threaded mounting hole in the side of the body accepts a mounting rod (25). 
 
The valve requires a minimum of 60 psi to properly operate the opening piston.  The shut-off function 
is achieved by an internal spring. 
 
The  air  line  to  the  valve  should  be  attached  to  a  three-way  air  supply  valve  (manual  or  automatic).  
Actuating this valve will open the pinch tube valve.  The open time determines the shot size. 
 
If using a remote reservoir, use the enclosed supply line (20, 21) to provide a connection point to the 
pinch tube (17-19) fluid inlet.  A syringe barrel can be mounted directly to the pinch tube fluid inlet.   
 
BE SURE ALL AIR HAS BEEN BLED FROM THE SUPPLY LINE TO OBTAIN REPEATABLE 
SHOT SIZES OR UNINTERRUPTED FLOW. 
 
 
NOTE:  if material drips from the needle tip, follow instructions below 
 

A.

 

Fully close the adjustment knob (4) to form a “crease” in the pinch tube.

 

 

B.

 

Operate the valve and slowly open the adjustment knob until material comes out from the tip. 

 

C.

 

Adjust the knob position per flow rate requirement. 

 

D.

 

Tighten the lock nut (15) to secure the flow rate adjustment. 
 

 
 
 
 
 
 

Reviews: