Fisher GX 3-Way Instruction Manual Download Page 9

Instruction Manual

D103312X012

GX 3-Way Valve and Actuator

July 2017

9

12.  If you had previously removed the actuator assembly from the valve, place the actuator assembly back onto the

valve body (key 1) or yoke extension (key 105, figure 12) for HT construction. Install the body nuts (key 7) and
tighten evenly using a cross‐tightening procedure. See table 3 for torque requirements.

D

For HT constructions,

 see figure 12. Ensure the valve body nuts (key 7) are tightened at the valve body (key 1)

and at the top of the yoke extension (key 105).

13.  With the valve plug/stem (key 3) on the lower seat, thread the lower stem connector (key 27) up to match the gap

setting between the actuator rod and stem adjustor nut specified in table 2. Thread the locknut (key 28) up against
the stem locknut and tighten to a torque of 48 N

S

m (35 lbf

S

ft) for 10mm stems or 175 N

S

m (129 lbf

S

ft) for 14mm

stems.

D

For HT constructions

 see figure 12. With the valve plug/stem (key 3) on the lower seat, thread the stem

extension (key 106) up to match the gap setting between the actuator rod and stem extension specified in
table 2. Thread the locknut (key 108) up against the stem extension and tighten to a torque of 48 N•m (35
lbf•ft) for the 10mm stems or 175 N•m (129 lbf•ft) for 14mm stems.

14.  Stroke the actuator rod until it contacts the lower stem connector (key 27), or stem extension (key 106, figure 12),

and install the stem connector halves and travel indicator (keys 23, 24, and 26) with the cap screws (key 25). Install
the stem connector halves in the proper orientation so that when looking at the inside of the stem connector
halves, the flats are down and the beveled surfaces are up.

15.  Align the pointer of the travel indicator (key 26) with the appropriate mark on the travel scale.

16.   Tighten the stem connector cap screws (key 25) to 35 N

S

m (26 lbf

S

ft).

Note

For fail‐up action, the air supply tubing must be connected to the actuator upper casing at the air supply connection, see figure 8.
(If converting from fail‐down to fail‐up, the tubing will need to be re‐routed to this location).

Packing Maintenance

Key numbers refer to figure 7.

Packing Adjustment

For ENVIRO-SEAL

 spring‐loaded single PTFE V‐ring packing (figure 7) or for ENVIRO-SEAL graphite ULF packing (figure

7), the Belleville spring pack (key 34) maintains a sealing force on the packing. If leakage is detected around the
packing follower (key 29) check to be sure that the packing follower (key 29) is tight. Using a wrench, tighten the
packing follower (key 29) in 1/4 turn intervals until the leakage is stopped. If leakage cannot be stopped in this
manner, proceed to the Replacing Packing section in this manual.

Replacing Packing (Pneumatic Actuators)

Isolate the control valve from the line pressure, release pressure from all three inlets/outlets of the valve body and
drain the process media from the valve. Shut off all pressure lines to the actuator and release all pressure from the
actuator. Use lock‐out procedures to ensure that the above measures stay in effect while you work on the equipment.

1.  

For fail‐down constructions, as shown in figure 11:

a.  Connect a separate air supply to the lower diaphragm casing via the air supply connection on the yoke (as shown

in figure 11) and apply sufficient air pressure to raise the valve plug/stem off the lower seat to mid travel.

Summary of Contents for GX 3-Way

Page 1: ...arts information for the Fisher GX 3 Way control valve and actuator system Do not install operate or maintain a GX 3 Way valve without being fully trained and qualified in valve actuator and accessory...

Page 2: ...tion Phone 1 641 754 3771 or 1 800 338 8158 E mail education emerson com emerson com fishervalvetraining Valve Installation WARNING Always wear protective gloves clothing and eyewear when performing a...

Page 3: ...result in uneven trim wear and improper operation With some valves the actuator may also need to be supported when it is not vertical For more information consult your Emerson sales office or Local Bu...

Page 4: ...ions in this manual to ensure safe removal of the actuator from the valve D Use lock out procedures to be sure that the above measures stay in effect while you work on the equipment D The valve packin...

Page 5: ...225 6 19 21 2 750 10 19 21 3 4 750 10 38 40 Table 3 Body Nut Key 7 Torque Requirements VALVE SIZE TORQUE NSm lbfSft DN 25 and 40 NPS 1 and 1 1 2 79 8 58 9 DN 50 NPS 2 163 120 DN 80 and 100 NPS 3 and 4...

Page 6: ...air supply to the lower diaphragm casing as shown in figure 11 WARNING To avoid personal injury or property damage due to actuator springs key 12 being under compression remove the long cap screws key...

Page 7: ...the diaphragm key 10 on the diaphragm plate key 11 Insert the cap screw key 14 through the actuator spacer key 13 and place this assembly through the diaphragm diaphragm plate assembly 2 Place the dia...

Page 8: ...it lays flat and not off balance Note If converting from fail down to fail up action first move the vent cap key 21 from the top of the casing see figure 8 and thread into the air supply connection on...

Page 9: ...g at the inside of the stem connector halves the flats are down and the beveled surfaces are up 15 Align the pointer of the travel indicator key 26 with the appropriate mark on the travel scale 16 Tig...

Page 10: ...as shown in figure 8 a Connect a separate air supply to the air supply connection on the upper casing shown in figure 8 and apply sufficient air pressure to move the plug stem to mid travel b Remove...

Page 11: ...king box leakage or damage the new packing 13 Inspect the valve stem threads and packing box surfaces for any sharp edges that might cut the packing Scratches or burrs could cause packing box leakage...

Page 12: ...rod until it contacts the lower stem connector key 27 or stem extension key 106 figure 12 and install the stem connector halves and travel indicator keys 23 24 and 26 with the cap screws key 25 Insta...

Page 13: ...sion key 105 to the valve body key 1 Loosen these nuts approximately 3mm 1 8 inch It is not necessary to loosen the nuts which attach the actuator yoke key 8 to the yoke extension 8 Then loosen the va...

Page 14: ...all the new packing and the metal packing box parts according to figure 7 for ENVIRO SEAL PTFE packing and according to figure 7 for ENVIRO SEAL graphite ULF packing Place a smooth edged pipe over the...

Page 15: ...the electric actuator maximum thrust output does not exceed the values in table 5 Table 5 GX 3 Way Electric Actuator Maximum Allowable Thrust VALVE SIZE STEM DIAMETER TRAVEL STEM MATERIAL MAXIMUM THRU...

Page 16: ...en applying torque Tilting the gun and socket while applying torque may cause the lugs on the seat ring or cage tool to suddenly disengage from the lugs on the seat ring or cage thus causing possible...

Page 17: ...e on the cage see figure 10 Apply a general purpose silicone based lubricant 4 Before installing a new cage thoroughly clean the threads in the valve body Apply a suitable lubricant to the threads and...

Page 18: ...e slowly as this will seat the seal ring to the plug Make sure the seal ring key 37 or backup ring key 38 does not become disengaged from the cage groove 7 To insert the plug stem assembly key 3 into...

Page 19: ...0022 RGX750X0032 Bottom Port Common Seal Kits BOTTOM PORT COMMON SEAL KITS 1 Valve Size DN 25 NPS 1 DN 40 NPS 1 1 2 DN 50 NPS 2 DN 80 and 100 NPS 3 and 4 Nitrile Contains keys 37 and 38 RGX3WAYX012 RG...

Page 20: ...meplate 36 Warning Label Key Description 37 Seal Ring see bottom port common seal kits table 38 Backup Ring see bottom port common seal kits table 42 ENVIRO SEAL Packing Set see packing kits table 43...

Page 21: ...Instruction Manual D103312X012 GX 3 Way Valve and Actuator July 2017 21 Figure 7 Fisher GX 3 Way Packing GE37477_PACK ENVIRO SEAL PTFE PACKING ENVIRO SEAL GRAPHITE ULF PACKING GE37477_ULF...

Page 22: ...103312X012 GX 3 Way Valve and Actuator July 2017 22 Figure 8 Fisher GX 3 Way Control Valve and Actuator System Assembly Fail Up Side Port Common GE35775 D SIDE PORT COMMON AIR SUPPLY CONNECTION APPLY...

Page 23: ...GX 3 Way Valve and Actuator July 2017 23 Figure 9 Fisher GX 3 Way Side Port Common Trim Construction SIDE PORT COMMON GE37477_SP_TRIM Figure 10 Fisher GX 3 Way Bottom Port Common Trim Construction BOT...

Page 24: ...312X012 GX 3 Way Valve and Actuator July 2017 24 Figure 11 Fisher GX 3 Way Control Valve and Actuator System Assembly Fail Down Bottom Port Common GE35776 d AIR SUPPLY CONNECTION BOTTOM PORT COMMON AP...

Page 25: ...2 GX 3 Way Valve and Actuator July 2017 25 Figure 12 Fisher GX 3 Way High Temperature Control Valve and Actuator System Assembly Fail Up Side Port Common GE49204 C AIR SUPPLY CONNECTION SIDE PORT COMM...

Page 26: ...Instruction Manual D103312X012 GX 3 Way Valve and Actuator July 2017 26 Figure 13 Fisher GX 3 Way Electric Actuator Mounting GG12175 A...

Page 27: ...Instruction Manual D103312X012 GX 3 Way Valve and Actuator July 2017 27...

Page 28: ...available upon request We reserve the right to modify or improve the designs or specifications of such products at any time without notice E 2008 2017 Fisher Controls International LLC All rights res...

Reviews: