14
!0
9
INSTALLING THE DRAWER
7
6
Open the drawer fully, and remove
the T20 machine screws (4x) from
both sides of the door frame.
Slide the door frame and custom
panel up and off the drawer.
8
Drill pilot holes (6x) into the
custom panel through the screw
holes in the door frame.
Be careful not to drill through to
the front of the panel.
Secure the custom panel to the
door frame with T20 wood screws
(6x).
Slide the door frame back onto
the drawer and align the custom
panel vertically with surrounding
cabinetry.
Secure the door frame in place
with T20 machine screws (4x).
Align the custom panel carefully
with the cabinetry.
Ensure the custom panel is
correctly aligned and centered
before fixing to the tape as this
can only be done once.
Use shims (not supplied) to ensure
gaps are accurate.
shims
Summary of Contents for W30SDEI
Page 1: ...INSTALLATION GUIDE US CA INTEGRATED W30SDEI WARMING DRAWER ...
Page 2: ......
Page 17: ......