49
Step 2.
a) Fully lift the tailgate of your
vehicle.
The Docking Station will be
fully assembled and secured
in position by your engineer.
You should still carry out a
few safety checks yourself
on a daily basis to ensure
the Docking Station is still
secure.
b) Place your hands on the
center bar and gently and
slowly, with no force, pull the
center bar towards you, and
the rails will both come out
together.
c) Fully extend the rails, two
OK labels will be displayed
when the rails are fully
extended. Lower the rails to
the ground by bending
down, or you can use the
‘Assisting Cane’ provided to
avoid bending if needed.
ALWAYS use both hands to hold the green handles when sliding the
rail sections in and out.
Summary of Contents for Docking Station Mark II
Page 36: ...36 Part 2 Quingo Docking Station...
Page 81: ...81 NOTES...