STEP 1:

 

If media is already loaded in filter tank proceed to Step 4.  Otherwise, place red pipe cap (if 
provided) or a piece of tape over the end of the distributor tube to prevent media from entering 
the  distributor  tube  during  media  filling.    Make  sure  the  distributor  tube  is  centered  and  not 
suspended off the bottom of the tank by gravel (pre-loaded). 

 

STEP 2:

 

Use the fill funnel provided and add the provided media to the filter tank.  Do not overfill the 
tank.  At least 14” of freeboard (empty space) is required at the top of the media tank to allow 
for proper bed expansion during backwash.   

 

STEP 3:

 

Clean any media out of the tank threads and remove pipe cap or tape from distributor tube.

 

 

STEP 4: 

If  the  control  valve  is  already  installed  on  the  filter  tank;  unscrew  the  control  valve.    Using  a 
garden  hose  or  bucket  and  media  funnel;  fill  the  mineral  tank  with  water  to  allow  the  media 
time to saturate.  

 

STEP 5: 

Make sure control valve pilot tube and tank thread o-rings are lubricated with silicone lubricant 
and screw the control valve onto the filter tank. 

 

STEP 6: 

Shut off water at main supply.  Relieve pressure by opening nearest faucet.  On private well 
systems,  turn  off  power  to  pump  and  drain  pressure  tank.    SHUT  OFF  POWER  OR  FUEL 
SUPPLY TO WATER HEATER. 

 

STEP 7:

 

Cut main supply line as required

 

to fit plumbing to inlet and outlet of bypass valve.  DO NOT 

PLUMB  INLET  AND  OUTLET  BACKWARDS.    Piping  should  support  control  valve  in  an 
upright position.  Do not apply heat to any fitting attached to the bypass or control valve. 

 

STEP 8: 

Use  the  provided  drain  line  tubing  (

NO  VINYL  TUBING

)  to  run  drain  line  from control  valve 

discharge fitting to floor drain or sump pit capable of handling the backwash rate of the filter 
(refer to specifications and flow rate on page 12).  

DISCHARGE END OF THE DRAIN LINE 

MUST BE FIRMLY SECURED!  

Failure to properly secure the drain line will result in the drain 

line “whipping” and possibly flooding the area causing water damage.  There must be an air 
gap at the end of the drain line to prevent siphoning of waste water and meet plumbing code.  
Total length of drain line should be 15’ or less.  

AVOID OVERHEAD DRAINS

.   

 

 

 

Installation Instructions 

Summary of Contents for OXY2-10

Page 1: ...s LLC 12630 US Highway 33 N Churubusco IN 46723 Phone 260 693 1972 Fax 260 693 0602 OXY2 OXY2E Instruction Manual 180122 docx OXY2 OXY2E Series Iron Reduction System Installation Instructions and Owne...

Page 2: ...ng Time of Day Page 11 OXY2E Programming Page 12 Specifications Page 13 Component Parts Breakdown List Page 14 OXY2 Control Valve Breakdown Page 15 OXY2 Control Valve Parts List Page 16 OXY2E Control...

Page 3: ...ither clear water ferrous state red water ferric state or bacterial form The OXY2 iron filter can reduce any of these forms of iron Manganese A naturally occurring metallic element Manganese concentra...

Page 4: ...optimum filter performance and satisfactory water quality The following factors should be considered in selecting the location of the iron filter 1 The filter should be installed after the pressure t...

Page 5: ...e ground leg of the electric supply continuity should be maintained by installing ground straps around any non conductive plastic piping or bypass used in the installation Make sure the filter is not...

Page 6: ...with silicone lubricant and screw the control valve onto the filter tank STEP 6 Shut off water at main supply Relieve pressure by opening nearest faucet On private well systems turn off power to pump...

Page 7: ...the Service position Figure 3 page 4 STEP 11 Remove media fines by manually initiating regeneration For the OXY2 turn the manual backwash knob Figure 4 page 8 clockwise until the drive gear engages t...

Page 8: ...each screw slightly to release pressure on the 24 Hour gear time plate d Continue depressing the red Time Set Button and rotate the 24 Hour Gear to expose the Regeneration Time Pointer Figure 4a page...

Page 9: ...ts a day The number by the red pointer is tonight 3 Slide the metal tabs outward on the desired days of regeneration The OXY2 Filter should be set to backwash a minimum of every third day How to Manua...

Page 10: ...by shifting both the backwash pins and air draw holes an equal number of positions counter clockwise on the program wheel 4 AIR DRAW cycle may be lengthened by increasing the number of holes between...

Page 11: ...seconds to initiate an immediate regeneration cycle 2 Press and release Advance Button during a regeneration cycle to immediately advance the valve to the next step in the regeneration process 3 When...

Page 12: ...Use Up Button to set current hour Use Up Button to set current minute Use Up Button to set AM PM Default setting is 20 GPG This iron filter does not meter the water use Adjusting the water hardness s...

Page 13: ...egenerating Use Up Button to set minutes for time of backwash Use Up Button to set AM or PM for time of backwash The DEFAULT setting is not used for OXY2E iron filters and must be set to OFF Default c...

Page 14: ...ME cu ft 1 0 2 0 GRAVEL UNDERBED lbs 20 30 SERVICE FLOW RATES gpm Continuous 5 gpm ft 2 gpm 3 5 Peak 16 gpm ft 2 gpm 9 13 PRESSURE LOSS 1 psi Continuous Flow Rate 5 7 Peak Flow Rate 10 13 REGEN FLOW R...

Page 15: ...k Control Valve includes bypass valve OXY2E 10 Vlv Assy W BP OXY2E 20 Vlv Assy W BP Complete Electronic Control Valve includes bypass valve 2 D100S 54 Distributor Tube 1 x 54 3 MTP1054N MTP1354N Miner...

Page 16: ...15 OXY2 Control Valve Breakdown...

Page 17: ...ton Assembly 19 13304 Distributor O Ring 121 H FV2510 1PH Power Head Assembly 2510 TC with Cover 20 13030 Distributor Retainer I 60050 21 Drive Motor Assembly Not Shown 40027 J tube for 2510 valve Old...

Page 18: ...17 OXY2E Control Valve Breakdown...

Page 19: ...19936 Base Seal 2510 H 60160 10 Drive Cam Assembly STF 16 19322 2510 Adapter Base I 60308 13 2510E Timer Assembly 17 19197 Slip Ring J 60011 050ASSY Brine Valve 1650 Short Stem 0 5 BLFC with Tube 18...

Page 20: ...eded 2 Replace spacers and seals 3 Verify distributor tube seated securely in control valve body 4 Verify actual water usage flow rates against system specifications 5 Verify adequate pumping rate for...

Page 21: ...ly C Debris in control valve D Internal leak in control valve E Drive motor faulty 1 Ensure electrical outlet is functioning 2 Verify timer programming 3 Disassemble and clean control valve 4 Replace...

Page 22: ...21 Control Valve Wiring...

Page 23: ...unction occur contact the dealer that you purchased the product from If you are unable to contact the dealer contact First Sales LLC 260 693 1972 We will require a full description of the problem mode...

Reviews: