10
Assembly Instructions
b) Mount the Left Channel over the top of the Footplate
dome Bolts and then slide forward. Once Channel is
properly positioned, attach to T-Track using
4x M8x45 mm Bolts[16]. Repeat this procedure to
install Right Footplate and Channel.
STEP 3
Installing the Baseplate
a) Tilt the T-Channel slightly to allow the Footplate (with
pre-installed Bolts) to slide underneath as shown.
8
2
1
12
REQUIRED
T-Track
Channel Right
Channel Left
2 x Footplate
8 x M8x45mm Blots [16]
Foot Leveler [7]
Footplate
T-Track
2
1
Left
Channel
Slide Channel
forward
1
Channel Slot
2
3
8x45mmBolts
4
c) Stand Baseplate upright to install 6x Foot Leveler[7]
as shown. Once Foot Levelers are installed, the
completed Baseplate can be installed onto the Main
Frame of the E850.
Footplate
Channel Left
Footplate
Channel Right
T-Track
1
Completed Baseplate
1
2
Summary of Contents for E850
Page 1: ...USER GUIDE E850 FLUID EXERCISE ...
Page 2: ...2 ...
Page 22: ...22 ...
Page 23: ...23 ...