![Firepower PC250 Safety And Operating Instructions Manual Download Page 11](http://html1.mh-extra.com/html/firepower/pc250/pc250_safety-and-operating-instructions-manual_2292061011.webp)
INSTALLATION AND OPERATION
SITE LOCATION
Select a clean, dry location with good ventilation and adequate working space around all components.
Operation without proper air flow will inhibit proper cooling and reduce duty cycle. To prevent
entry of cutting or other metal debris, the power supply must not be operated in the horizontal position. Operate the
power supply in the vertical position only with the power supply control panel side up.
The power supply is cooled by air flow through the side and end panels. Air flow must not be obstructed. Provide at
least 12 inches (300 mm) clearance on each side. Provide sufficient clearance around top of the unit to allow access to
top panel controls (minimum 12 inches or 300 mm).
NOTE: Review the safety precautions in the front of this manual to be sure that the location meets all safety
requirements.
UNPACKING
The system is packaged with a carton and packing material to prevent damage during shipping.
A. System Components
Included with each system is the following:
(1) Power Supply with the following installed:
• EL60 Torch and Leads (1 each)
• Ground Cable with Clamp attached (1 each)
• Single-Phase Input Power Cable with Plug attached (1 each)
(1) Instruction Manual
(1) Spare Parts Kit - includes:
• Standard Tips (2 each)
• Electrodes (2 each)
B. Unpacking Procedure
1. Unpack each item and remove all packing material.
2. Locate the packing list(s) and use the list to identify and account for each item.
3. Inspect each item for possible shipping damage. If damage is evident, contact your distributor and/or
shipping company before proceeding with system installation.
ELECTRICAL CONNECTION
A. Power Requirements
1. 115 VAC Units
The unit will operate on single phase 115VAC, 60 Hz. The service must be fused for at least 20 amps. A 15
amp circuit is insufficient for proper system operation.
11
CAUTION