Firegear ESTOP-RM-KIT Installation And Operating Instructions Download Page 3

REV. A                 Page 3

ESTOP-RM-KIT

Step 5

: Install the (4) 10-24 x 1.25” Phillips screws through 

the mounting brackets, into the wall board holes and secure 

with a washer and nut  (on back side) for each hole.

PUSH TO STOP

TURN TO START

OFF

TURN

PAST

Fig. 4 

 Shows ESTOP mounted into wall.

PUSH TO STOP

TURN TO START

OFF

TURN

PAST

Cover Plate

Step 6

: Install the cover plate overtop of the ESTOP gas 

timer.  Align the holes in the cover plate with the holes in 

the ESTOP gas timer (top and bottom) and install the two 

(2) mounting screws (#10-24x6.25 SS Phillips screws) to 

secure the cover plate as shown in Figs.5 and 6.

Wall Board

Cover Plate

Mounting 

Screw

Mounting 

Screw

Fig. 5 

 Installing cover plate.

Fig. 6 

 Side view of  ESTOP mounted into wall.

Step 7:

  When cover plate is installed over the ESTOP gas 

timer it will protrude 

”. See Fig. 7 for outside dimensions.

PUSH TO STOP

TURN TO START

OFF

TURN

PAST

5¾”

6¾”

Fig.7

 Cover plate outer dimensions.

Step 8: 

After the ESTOP-RM-KIT is installed then use gas 

rated Teflon tape on the gas lines to connect gas supply. 

Ensure you check for gas leaks before final operation.

Reviews: