background image

Condensate Plume disPersal

When choosing the location for a condensing boiler, special consideration must be given to the positioning of the flue terminal. 
Care should be taken to locate it so as to prevent either the end user or their neighbours perceiving the plume to be a nuisance.

It should be noted that the normal statutory clearances required around low level flue terminals may not be sufficient to cope 
with plume dispersal from a condensing boiler.

4

13

4.5 InstallatIon  - flue systems

SILVERPAC & SLIMLINE SILVERPAC FLUE

Put the 90˚ flue terminal

with the cone on the boiler.

Fix the guard plate to the boiler and

then the guard to the boiler.

Heatpac boiler

after installation.

Fig. 1

Fig. 2

Fig. 3

SILVERPAC

Put the 90˚ flue terminal

with the cone on the boiler.

Fix the guard and the guard

plate to the boiler.

Slimline Heatpac boiler

after installation.

Fig. 1

Fig. 2

Fig. 3

SLIMLINE SILVERPAC

90˚ terminal should be tilted up

to prevent condensate droping

from end of flue

For right hand flue option, remove the

two screws securing the flue, rotate the flue

and swap the removable side panels

installation instruCtions are suPPlied WitH all Flue Kits

(see BeloW For silVerPaC & slimline silVerPaC)

Summary of Contents for Silver Boilerhouse

Page 1: ...ine Silverpac Silver Boilerhouse Silver Utility E l c o S i l v e r p a c S l i m l i n e S i l v e r p a c S i l v e r B o i l e r h o u s e S i l v e r U t i l i t y This manual must remain with the...

Page 2: ......

Page 3: ...Silverpac 22 8 2 Slimline Silverpac 23 8 3 Silver Boilerhouse 24 8 4 Silver Utility 25 9 Wiring 9 1 Silverpac 26 9 2 Slimline Silverpac 27 9 3 Silver Boilerhouse 28 9 4 Silver Utility 29 10 Terms Con...

Page 4: ...t Aid medical attention should be sought following eye contact or prolonged reddening of the skin The small quantities of adhesives and sealants used in the product are cured They present no known haz...

Page 5: ...ates automatically if a fault occurs in the burner operation Should this occur the light on the front of the burner will illuminate This could be caused by A An interruption in the fuel supply eg empt...

Page 6: ...g Regulations To ensure the highest standards of installation safety it is important that the boiler be installed in compliance with the following regulations where applicable It is the responsibility...

Page 7: ...828 2012 A1 2014 etc Please note following important points before commencing installation Installation Commissioning Boilers must be installed commissioned and serviced by a competent qualified engin...

Page 8: ...and cleaned during annual service The condensate line should be plastic and have a minimum diameter of 22mm dia have a fall from the boiler of 1 200 minimum have as few bends as possible to reduce the...

Page 9: ...Pipe 75mm Min 50mm Air Gap Figure 4 Ensure that the boiler combustion chamber cannot be filled through the condensate trap from another appliance eg washing machine which is drained at a higher level...

Page 10: ...4 8 4 2 INSTALLATION CONDENSATE DISPOSAL Condensate Trap Fitting 1 Push washer into trap socket and screw trap onto boiler socket 2 Push flexible pipe onto trap socket 3 Final assembly Washer S S trap...

Page 11: ...Pressure Jet Location Appliance Burner Type Condensing UK ROI NI A Directly below an opening airbrick opening window etc 1000mm 600mm B Horizontally to an opening airbrick opening window etc 1000mm 60...

Page 12: ...to BS EN 303 1 5 Terminating positions must be at least 1 8m distant from an oil storage tank unless a wall with at least 30 minutes fire resistance and extending 300mm higher and wider than the oil...

Page 13: ...ed to ventilate and to avoid overheating in the boiler area FULL TEXT of both BS 5410 1 2014 and appropriate Building Regulations for each country should be obtained and fully applied N B Please note...

Page 14: ...Balanced flue TOP mark Snorkel 1 Push the flap valve into the balanced flue air intake 2 Ensure that the flap valve is in the correct position 3 Push the snorkel hose over the flap valve and air inta...

Page 15: ...LVERPAC SLIMLINE SILVERPAC FLUE Put the 90 flue terminal with the cone on the boiler Fix the guard plate to the boiler and then the guard to the boiler Heatpac boiler after installation Fig 1 Fig 2 Fi...

Page 16: ...p plate System 35 flexible liner suitable for condensing applications System 35 adaptor 500mm Adjustable length Boiler adaptor Condensing boiler Condensing boiler NOTE All brick chimney constructions...

Page 17: ...rs with a waterproof membrane between the piers of the tank Oil storage tanks should not be sited within 1 8m of boiler flue outlets Do not allow household waste or hot ashes container in vicinity of...

Page 18: ...installer to ensure that the boiler is properly commissioned when first used u The boiler should be commissioned by a competent qualified engineer preferably OFTEC registered and familiar with Firebi...

Page 19: ...on for the trap Vacuum out any loose debris from the chamber 3 Clean the inside of the boiler with a vacuum cleaner 4 Refit all the baffles and the condensate trap securely 5 System pressure should no...

Page 20: ...C standards and all other relevant legislation Preset Pressure Relief Valve 3 bar Water Side Resistance 12 20kW 20 26kW 26 35kW Flow Rate To Give A Nominal Output At 10K Differential Flow Rate Measure...

Page 21: ...e with BS 7074 Part 1 BS 5449 OFTEC standards and all other relevant legislation Preset Pressure Relief Valve 3 bar Water Side Resistance Flow Rate To Give A Nominal Output At 10K Differential Flow Ra...

Page 22: ...Rate Measured 1642 kg h 2135 kg h 2874 kg h Waterside Resistance 0 18 mbar 0 18 mbar 0 18 mbar Flow Rate To Give A Nominal Output At 20K Differential Flow Rate Measured 870 kg h 1131 kg h 1523 kg h Wa...

Page 23: ...low Rate Measured 1642 kg h 2135 kg h 2874 kg h Waterside Resistance 0 18 mbar 0 18 mbar 0 18 mbar Flow Rate To Give A Nominal Output At 20K Differential Flow Rate Measured 870 kg h 1131 kg h 1523 kg...

Page 24: ...CC000FLX 9 1 Drain cock ACC012DRC ACC012DRC ACC012DRC 10 1 Heat deflector ACC000HDF ACC000HDF ACC000HDF 11 1 Flap valve adapter ACC000FVA ACC000FVA ACC000FVA 12 1 Flap valve ACC000FLP ACC000FLP ACC000...

Page 25: ...ondensate hose ACC000FLX ACC000FLX 9 1 Drain cock ACC012DRC ACC012DRC 10 1 Heat deflector ACC000HDF ACC000HDF 11 1 Flap valve adapter ACC000FVA ACC000FVA 12 1 Flap valve ACC000FLP ACC000FLP 13 1 Flue...

Page 26: ...1 Stat pocket ACC003PKT ACC003PKT ACC003PKT 7 1 Condensate trap ACC000TRP ACC000TRP ACC000TRP 8 1 Condensate hose ACC000FLX ACC000FLX ACC000FLX 9 1 Drain cock ACC012DRC ACC012DRC ACC012DRC 10 1 Heat...

Page 27: ...p ACC000TRP ACC000TRP ACC000TRP 8 1 Condensate hose ACC000FLX ACC000FLX ACC000FLX 9 1 Drain cock ACC012DRC ACC012DRC ACC012DRC 10 1 Heat deflector ACC000HDF ACC000HDF ACC000HDF 11 1 Air hose ACC000SSH...

Page 28: ...ions in the control panel Use heat resistant cable Protect supply with 5A fuse Power to burner 5 pin plug High temperture limit thermostat Reset pin inside Screw off cover Temperture control dial Max...

Page 29: ...to the boiler A heat resisting cable must be used which can be routed into the boiler through the access provided on either side of the base Ancillary controls may be provided for with terminal connec...

Page 30: ...tant cable is used 2 No single insulated cable is exposed at connection points on the therrmostat burner plug and socket 3 All relevant lids and covers are properly replaced and secured correctly 4 A...

Page 31: ...ided for with terminal connections in the control panel Use heat resistant cable Protect supply with 5A fuse Pump over run thermostat 87 C Please note that a permanent live connection is required to e...

Page 32: ...n technical manuals b all relevant standards and codes of practice 4 A competent qualified engineer preferably OFTEC registered using the correct installation and test equipment must carry out install...

Page 33: ...y Consumption Sound Power Level kW GJ dB SILVERPAC 12 20kW A 20 92 50 N A 20 26kW A 26 92 72 N A 26 35kW A 35 92 95 N A SLIMLINE SILVERPAC 20 26kW A 26 92 72 N A SILVER BOILERHOUSE 12 20kW A 20 92 50...

Page 34: ......

Page 35: ......

Page 36: ...contact Firebird Heating Solutions Ltd dar s Industrial Estate Baile Mhic re Co Cork P12 HK51 Ireland t 353 0 26 45253 f 353 0 26 45309 e info firebird ie web www firebird ie Firebird Heating Solutio...