Contact us for assistance: (866) 985-7877 | www.wtliving.com
9
ASSEMblY
13
Install Reflector.
NOTE: MAKE SURE TO REMOvE THE blUE
REFlECTOR TAPE ON REFlECTOR PIECES PRIOR
TO ASSEMblY!
Assembly Tip: If necessary for proper alignment of
reflector sections, loosen each screw prior to further assembly and
retighten after sections are aligned.
Slide two
Reflector Panels
together. Insert one
Small Screw
front underneath and loosely
screw on
Cap Nut
from top. Repeat with the other
Reflector
Panels
. Slide
Reflector Center Cap
onto assembled
Reflector
Panels
. Insert one
Small Screw
and screw on
Cap Nut
loosely.
Repeat with two more
Small Screws
and
Cap Nuts
to complete
reflector assembly. Fully tighten all screws and cap nuts.
Hardware Used:
9x Small Screw | 9x Cap Nut
14
While supporting heater, tilt the
Head Assembly
and slide
3
large Flat Washers
over the
Reflector Studs
. Place
the reflector assembly onto the
Reflector Studs
and slide 3
large Flat
Washers
over the
Reflector Studs
and onto the
Reflector Assembly
.
Secure with 3
Wing Nuts
. Once you have tightened the
Wing
Nuts
, return the heater to an upright position.
Hardware Used:
6x Large Flat Washer
3x Wing Nut
15
Slide
Cylinder Cover
up and rest the
Cylinder Cover
on the
Post Support
. Connect the
Gas Hose
and
Regulator
to the LP cylinder. (The LP cylinder is sold separately. Use a standard
9.07 kg / 20 lb propane cylinder
only
.) Screw
Regulator
on to the
Gas
Hose
. Do not cross thread. Hand tighten securely then tighten with the
Wrench
. Attach the
Regulator
to the valve on the LP cylinder and
hand tighten securely. Place LP tank onto base of heater. Secure the
LP gas tank by tightening the
large bolts
on the
brackets
on the
base
. Lower the
Cylinder Cover.
NOTE: Use this heater only with a propane vapor withdrawal
supply system. See chapter 5 of the standard for storage and
handling of liquefied petroleum gas, ANSI/NFPA 58. Your local
library or fire department should have this book.
13
13
13
13
14
14
15
15