Document #15668 Rev. I 04/20/98 P/N 15668:I
21
Installation
CHAPTER 2
Installation
Carefully unpack the system and check for shipping damage. Mount the cabinet in a clean, dry, vibration-free area
where extreme temperatures are not encountered. The area should be readily accessible with sufficient room to easily
install and maintain the panel. Locate the top of the cabinet approximately 5 feet (1.5 m) above the floor with the
hinge mounting on the left. Determine the number of conductors required for the devices to be installed. Sufficient
knockouts are provided for wiring convenience. Select the appropriate knockout(s) and pull the required conductors
into the box. All wiring should be in accordance with the National and/or Local codes for fire alarm systems.
Note: Effective September 1, 1998, the cabinet illustrated in Figure 2-1 and Figure 2-2 will be discontinued. The
dimensions for the new cabinet, which will be shipped beginning 9/1/98, are illustrated in Figure 2-3 and Figure 2-4.
FIGURE 2-1:
MS-9200 Cabinet Dimensions - older version (manufactured through 9/1/98)
To remove entire
knockout, strike here.
To remove inner
knockout, strike here.
BB-17F
Technical Manuals Online! - http://www.tech-man.com
firealarmresources.com