
Version: August 2020
4
Exposed Burner Removal Process
LPG / Natural Gas
GD6 EB Cover Panels
GD6 EB 1200
Input 55-65 MJ/h
One gas injector on the
front burner tube and one
gas injector on each of the
two rear burner tubes.
.
GD6 EB 1400
Input 55-65 MJ/h
One gas injector on the
front burner tube and one
gas injector on each of the
two rear burner tubes.
GD6 EB 1600
Input 65-70 MJ/h
One gas injector on the
front burner tube and one
gas injector on each of the
two rear burner tubes.
A
•
Remove the side panels (2 x screws) at each end of the
exposed burner.
•
Remove the front cover panel from under the exposed burner.
•
Remove the side panels (2 x screws) at each end of the
exposed burner.
•
Remove the front cover panel from under the exposed burner.
Note:
It will be necessary to lift the exposed burner up (at the
front) to allow the front cover panel to clear under the supporting
leg.