background image

Version: June 2019                                                                                 

                    

 

 

 

 

Step 1: Unpack and ensure all components are correct and undamaged 

 

  Appliance.  

  Box of firebed mediums.  

  Flue kit. 

 

Step 2: Install plinth (if required)  

 

  If the appliance is to sit on a plinth, ensure it is capable of 

supporting a 150kg load. 

 

  There is no clearance requirement for the base of the appliance.  

It may safely sit directly upon combustible (eg. timber)  
and non-combustible (eg. concrete) materials.  

 
 

 
Step 3: Install appliance into position 

 

  Before installation, confirm all minimum clearances  

     from the outside surfaces of the fire to the surrounding  
     enclosure is no closer than100mm from combustible  

 

 

     materials and non-combustible materials.  
  

  The exception to these minimum clearances is the base, the base can 

safely sit directly upon combustible (eg. timber)  
and non-combustible (eg. concrete) materials.  

 

 

The appliance is supplied with a 1000mm long braided stainless steel gas 
hose with a male gas bayonet connector that will plug into a gas bayonet 

socket (gas bayonet socket not supplied). Refer to appropriate 

‘The Fire Dept.’ product specification for 

specific gas bayonet location requirements. 
 

 

The appliance is supplied with a 1000mm long electrical cable and 3 pin plug that will plug into the electrical 
wall socket (electrical wall socket not supplied). Refer to appropriate 

‘The Fire Dept.’ product specification for 

specific gas bayonet location requirements. 

 

• 

Locate appliance into position and ensure that it complies with the minimum clearances required (100mm for 
combustibles) to the surrounding enclosure. The exception to these minimum clearances is the base, the 
base can safely sit directly upon combustible (e.g. timber) and non-combustible (e.g. concrete) materials, 
refer to the appropriate appliance specification for the correct clearance requirements. Ensure the framing is 
capable of supporting a 150kg load. 
 

• 

The base has 2 x 10mm holes at the back of each side. 

 

  Mark out and drill fixing holes through the 10mm holes in the base. Ensure holes are drilled in the centre of 

the holes. Clear out any debris from drilling. 

 

  Ensure the appliance is level and pack up corners to suit where necessary. Fix bolts / screws into floor. 

Check and ensure unit is level. 

 

  If the electrician and/or gas fitter is available at this stage the electrical supply and gas supply can be 

connected and tested/commissioned (see steps 5 & 6). 

 
 

Summary of Contents for GD13

Page 1: ...GD13 Installation Guide Operating Instructions Warranty...

Page 2: ...ppliance particularly the steel surrounding glass panels to the face or the door become extremely hot during operation and can result in serious injury and burns if touched It is therefore recommended...

Page 3: ...cific gas bayonet location requirements The appliance is supplied with a 1000mm long electrical cable and 3 pin plug that will plug into the electrical wall socket electrical wall socket not supplied...

Page 4: ...oing the 4mm Allen head cap screws Gently pull at the top corners in a forward motion The glass will tilt forward In one movement gently pull the glass up and away from the fire to break the magnetic...

Page 5: ...op sides of the glass and powerful magnets in each lower corner On the back corners of the glass there are 3mm steel magnet panels In one Movement gently lower the glass down allowing the steel magnet...

Page 6: ...25mm clearance from combustible materials 75mm clearance from wiring and plastic pipes and a minimum of 5mm from non combustible materials is required when installing a flue system for any appliance s...

Page 7: ...ntroller the cover panel will need to be lowered carefully and remain close to its original position Front Cover Installation Process Fit the front cover which is held in place by 9 x 5mm cap screw 3...

Page 8: ...dels have a glass failure safety switch at the base of the opening The safety switch turns the appliance off if the glass is not in position The 3mm pin will need to be held down to complete electrica...

Page 9: ...Version June 2019 9...

Page 10: ...afety pin down NOTE The masking tape must be removed once testing is completed Switch the appliance on Test adjust high first and then the low pressures against rating plate specifications The GD13 ha...

Page 11: ...ould be taken when placing the firebed mediums into the burner tray Failure to place the medium correctly may result in the fire performing inefficiently Open the firebed cardboard box and identify fi...

Page 12: ...empty the bags of vermiculite into the burner tray Ensure not to spill any vermiculite in cavities in front of and behind burner tray Do not pour vermiculite directly into burner slots Fill area behin...

Page 13: ...e appliance off and slightly repositioning rocks and logs at the problem areas Repeat this switching on off and repositioning until a natural and non uniform flame effect is achieved Once a natural an...

Page 14: ...erate appliance Following the GD13 Operating Instructions on the next page show the owner how to switch the appliance on and off and how to switch between high and low settings If the owner is not ava...

Page 15: ...on off switch to the ON position Press the high low switch to the HIGH position The electronic solenoid pack will start to click Gas will then be released and ignited at the pilot valve The safety sen...

Page 16: ...oor pilot flame 3 Signal to flame rectifier interrupted 1 Check gas supply 2 Check flame size and pilot flame pressure 3 Check flame rectifier and wire to sit pack Flame in not running the full length...

Page 17: ...warping if a firebox outer skin or support frame defect occurs contact The Fire Dept and the defect will be repaired or replaced at our discretion with all costs covered The Fire Dept warrants the SI...

Reviews: