background image

71-0156

 

Page 9 

4215-136 

Rev. 03

 

 

10/21/2022 

30.

 

Using the 5-

1/2” Torq screws, 

screw through the roof panel to 

secure to the top of the walls. Secure the roof panel at the front of 
the sauna and ensure the side overhang in the back of the sauna is 
the same as the front. Secure roof to back wall and then side walls.  

 

31.

 

Once the roof panels are secured, remove the guide strips at the 
front so trim can be installed later. 
 

32.

 

Nail fascia trim to the exterior edge of roof starting with the back 
edge. Next the two side edges, and lastly the front edge. The fascia 
top should be flush with the top of the roof panel. 

 
 
 
 

33.

 

Install eve trim under the overhanging fascia on front and back of 
sauna only. The front side eve trim is flush to the left and right-side 
fascia. The back trim is flush to the left and right-side fascia.  

 

34.

 

Install the left and right-side eve trim so it is flush to the back 
side trim and front side trim.  

 

35.

 

Install exterior cove trim to the back wall so it is flush to the left 
and right edges of the wall.  

 

36.

 

Install exterior cove trim to left and right-side walls so it is flush 
to back side cove and the edge of the front wall. 

 

37.

 

Install exterior cove trim to front wall so it lays flush to left and 
right-side cove.  

 

38.

 

Install the roofing felt on the roof panel using a roofing stapler. 
Start from the low side of the room, working towards the high 
side. Overlap the paper a minimum o

f 2”. 

Trim roofing felt to be flush with the edges of 
the roof panels.  

 
 
 
 
 
 

 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 

 
 
 

 

 

Summary of Contents for Euro Outdoor Series

Page 1: ...autions Before Use 2 Exterior Paint Requirements 3 Receiving Shipment 4 Installation Summary Base Wall Panel 5 6 Top Plate 7 Standard Roof 8 9 Metal Roof 10 Interior 12 14 Heater Wiring Rocks 14 Commo...

Page 2: ...s maintained in the sauna room WARNING The use of alcohol drugs or medication can increase the risk of fatal hyperthermia WARNING Prolonged exposure to elevated temperatures is capable of inducing hyp...

Page 3: ...er vs Oil Supplier Additional Comments Western Red Cedar Paint Duration Water based Sherwin Williams Self Priming Emerald Water based Sherwin Williams Self Priming Pittsburgh Paramount Water based Var...

Page 4: ...d of time you will have a better feel for the entire process Your sauna package will arrive on a stretch wrapped pallet including a stack of prebuilt panels benches and boxes with the heater and acces...

Page 5: ...les are purposely made at an angle b Integral Floor rooms less than 5x7 The base frame will be built into the integral floor 2 The base rail is numbered to correspond with the panels Number 1 should b...

Page 6: ...holes and use the supplied 3 screws to secure the two panels together 8 Continue to install each wall panel with the corresponding base number staring from your initial corner and working around the r...

Page 7: ...p plates ensure all panels are fully connected on top and on the corners 16 Install back top plate first Matching top plate with the corresponding wall panels number Install notched ends facing up 17...

Page 8: ...e roof panel into place without scratching the panels When in position it will rest on the top plate 26 The guide strip will align exterior of the high side wall panel until final placement is set and...

Page 9: ...the overhanging fascia on front and back of sauna only The front side eve trim is flush to the left and right side fascia The back trim is flush to the left and right side fascia 34 Install the left a...

Page 10: ...starting point for roof placement Note Determines the distance from the edge to the start of the metal roofing sheets 41 Begin to install the metal roofing based of your predetermined lay out of meta...

Page 11: ...ark and cut the front ridge with a of overhang on each side 48 Install front flashing to the roof so there is of overhang on each side Secure on top with sheet meal roofing screws one 5 1 2 from each...

Page 12: ...stall starting with the top bench support first o Position the bench supports tight into corner Making sure they are level use 3 screws and pre drilled holes to secure the bench supports to the walls...

Page 13: ...alled on the back wall If you have a return bench the other backrest will be above the return bench 57 Place backrest finished side down on the upper bench with the LED light strip closest to the benc...

Page 14: ...ay or may not need a low voltage connection box for the lights When using a SaunaLogic2 control the lights are hooked up inside the regular contactor box Other heaters such as the Designer Vena and ot...

Page 15: ...auna These products will off gas during the heating cycle and could be harmful to your health The only approved product to use on the interior of your sauna is 100 pure paraffin oil Available from you...

Page 16: ...al dealer Date of Purchase _______________________ Place of Purchase ____________________________ Enjoy Your Sauna Follow Finnleo finnleosauna on social media Tag Finnleo include MyFinnleo for a chanc...

Reviews: