16
13. Inspection before Power-On
1. Check whether the flow meter is damaged during transportation and installation.
2. Check whether the voltage of the power supply is consistent with that specified on
the nameplate.
3. Check whether the fuse used is of the correct current value.
4. Check whether the flow meter is grounded correctly.
5. Open the pipe valve to fill the pipeline system with liquid. One should pay attention
to removing the leaked gas and residuals in the system.
6. Power on the flow meter to warm up for 10 minutes. Then it can work normally.
Summary of Contents for EPD36
Page 26: ...23 15 Ordering Information...
Page 39: ...3 1...
Page 40: ...4 2 2 1 7 2 2...
Page 42: ...6 3 2 7 4...
Page 43: ...7 5 5D 2D 1 100 PFA 150 6 5 S cm 7 40 70 5 95 of RH 86 106 KPa 24Vdc...
Page 46: ...10 9 2 3 PFA 1 ClF3 2 1 20 150 2 9 2 4 316L 9 2 5 IP67...
Page 48: ...12 11 11 1 5 D 2 D 11 2 11 3...
Page 49: ...13 11 4 11 5 a 10 b c 5 D D 2 D D d e f 400A m g h 10 10 5D 2D...
Page 50: ...14 i 30 D D j k PTFE PTFE l m n DN50 2mm DN65 DN150 3mm DN200 4mm o p q...
Page 51: ...15 11 6 1 2 3 5m 4 5 5m...
Page 52: ...16 11 7 1 6mm2 10 11 8 a 4...
Page 54: ...18 13 1 2 3 4 5 6 10 14 14 1 1 1 1 2 2 3 3 3 ENT ENT ENT ENT ENT ENT...
Page 55: ...19 14 1 1 14 1 2 Read Only ENT ENT 0 0000 m3 h 1274205 8 Liter L H 00 00 Bar...
Page 56: ...20 14 2 0 1 1 N A 2 1 N A 1 5 N A 1 4 N A 2 4 N A 3 1 N A 3 3 N A 1 9...
Page 64: ...28 14 3 1 2 3 4 5 OCC 6 CLR 7...
Page 66: ...30 15...
Page 67: ...31 16 20 70 80...
Page 68: ...32 17 7 1m s 10m s 10 28 RS 485 RS 485 12VDC NPN...