HP-4 Direct Curved Installation Instructions
2 of 12
Step 1 - Mounting & Suspension
Mounting Options
Option 1
T-Bar Mounting - GridBox™ and Caddy Clips
•
Install GridBox™ and electrical conduit at feed locations.
•
Install caddy clips at mounting point locations.
•
All caddy clips are to be secured to structure, per local building codes.
Option 2
Drywall (C4) or other hard surfaces* - J-Box and Anchor Bolts
•
Install J-Box and electrical conduit at feed locations.
•
Install anchor bolts at mounting point locations.
•
All anchor bolts are to be secured to structure, per local building codes.
* Other hard surfaces include: wood, sheet metal panels, steel beams,
concrete or masonry. Use hardware appropriate for each surface material type.
GridBox™ (provided)
1/4"-20 Anchor
Bolt (by others)
Caddy Clip
(provided)
J-Box (by others)
Curved Starter (180°)
ID: 1
Curved Joiner (90°)
ID: 2
Joiner/Ender
ID: 3
Endcap
GridBox™
(provided)
1/4"-20 Anchor Bolt
(by others)
J-Box
(by others)
Caddy Clip
(provided)
Mounting Option 1
Mounting Option 2
or
or
or
or
or
or
CONTINUED
Suspension Locations
Refer to Record Drawings and building plans to determine
exact mounting, suspension points, and power feed locations.
Use drawings on page 3 as measurement references.