Page 3
Assembly Procedure (15-2N-TRL-GS)
After removing the tank from the box, start the assembly proce-
dure by turning the tank upside on a stable, flat surface.
A 1/2” socket wrench is required for this step.
Do not over-tighten bolts.
A) Mount the axle spacer to the underside of the tank as shown
in Step 1. Use (2) hex bolts to secure it to the tank.
B) Slide the trailer tongue through the axle spacer.
C) Loosely attach the tank supports to the tongue, using the
flange hex bolt (full thread) and nut.
D) Attach the tank supports to the tank using (2) hex bolts.
Snug the bolts but do not over-tighten.
A 1/2” socket wrench is required
for this step.
Remove the hitch plates from the
parts bag. Place on top and bottom
of tongue and bolt together, as
shown in Step 2.
Tighten the bolts and nuts securely.
Remove the axle, cotter pins and (2) wheels from the
carton. Slide the axle through the hole in one
side of the axle spacer and through the corre-
sponding hole on the other side. Now slide a
wheel over the axle and up against the axle
spacer. Make sure the valve stems of the
wheels are facing outward. Place a cotter pin
through the hole at the end of the axle. Using
a needle nose pliers or similar tool, bend the pins
so that they will not slip out and the wheel will be
retained on the axle. Repeat procedure for the other side.
Now you can turn the unit over to finish
assembly.
A 1/2” socket wrench is required for this
step.
Secure the trailer boom mount to the back
of the tank with (4) flanged hex bolts.
Snug the bolts but do not over-tighten.
Step 1
Step 3
Step 4
Step 2