
FilterWater.com
800-439-0263
Copyright
©
2008 filterwater.com
http://www.FilterWater.com
Circuit and installing diagram
Filters/RO Flushing Procedures
1.
Make sure the filters are installed, the System to deliver the best possible drinking water.
2.
Allow water flow to fill the reservoir and drain the system three times. Make sure to avoid water
spills, and use a pen to catch the water from both drains.
3.
Refill the reservoir again, cover the reservoir tank and cabinet by placing back lids, plug in the
System, and turn both switches “ON”.
4.
Dispense two glasses of water from each faucet/spout to avoid trapped air.
Installing the system to the water supply
1.
The system must be in the upright position at all times .Make sure to have the System in an
upright position 24 hours prior to installation.
2.
Use only ¼” OD tubing to connect the cold water supply to the system.
3.
Shut the cold water supply line off.
4.
Make sure cold and hot switches are off.
5.
Make sure filter flushing is completed before cooler is installed.
6.
Make sure to install the System on cold potable water supply.
7.
Install a pressure regulator, such as a slow flow regulator on the tubing in front of unit’s water
inlet to regulate the water pressure could exceed 60 P.S.I.G.