Page
2
of
5
ISO
9001:2015
Certified
Doc.
No.
06
‐
479
●
Rev.3,
March
2019
Installation
Installation
and
wiring
should
be
performed
by
qualified
personnel
only.
Equipment
damage
and/or
malfunction
may
result
from
improper
installation.
Disable
all
critical
system
functions
and
remove
all
power
from
the
system
until
the
installation
is
complete
and
ready
for
testing.
CAUTION
The
DACT
circuit
board
contains
static
‐
sensitive
components.
Handle
the
electronics
by
the
edges
only
and
avoid
touching
the
integrated
components.
Keep
electronics
in
the
protective
static
bag
it
was
shipped
in
until
time
for
installation.
Always
ground
yourself
with
a
proper
wrist
strap
before
handling
the
module(s).
If
the
installer
is
properly
grounded
at
all
times,
damage
due
to
static
discharge
will
not
occur.
If
the
module
requires
repair
or
return
to
Fike,
it
must
be
shipped
in
an
anti
‐
static
bag.
The
DACT
is
installed
onto
the
threaded
press
studs
provided
in
the
back
of
the
enclosure
using
the
following
mounting
hardware
supplied
with
the
card.
Standoff
Hardware
Kit,
P/N
02
‐
12037,
includes:
02
‐
11751
6
‐
32
hex.
Standoff,
2”
long,
F/F
(CyberCat™
254/1016
and
Cheetah™
Xi)
02
‐
11833
6
‐
32
hex.
Standoff,
5/8”
long,
F/F
(CyberCat™
50
and
Cheetah™
Xi
50)
02
‐
1589
6
‐
32
x
.375
Phillips
pan
head
screw,
zinc
plated
(CyberCat™
50
and
Cheetah™
Xi
50)
02
‐
16870
6
‐
32
hex,
Standoff
3/8”
long,
M/F
(CyberCat™
254/1016
and
Cheetah™
Xi)
To
install
the
DACT
into
the
CyberCat™
50
or
Cheetah™
Xi
50
system
enclosures:
1.
Carefully
unpack
the
DACT
and
check
for
shipping
damage.
2.
Secure
the
four
.625”
F/F
standoffs
(P/N
02
‐
11833)
onto
the
threaded
press
studs
on
the
back
of
the
enclosure,
as
shown
in
the
image
below.
NOTE
For
the
CyberCat™
50
or
Cheetah™
Xi
50,
install
the
DACT,
then
install
the
system
control
board.
3.
Install
the
DACT
onto
the
standoffs
and
secure
it
in
place
by
threading
the
four
6
‐
32”
screws
(P/N
02
‐
1589)
through
the
board
and
into
the
standoffs.
DACT
Mounting
for
CyberCat™
50
or
Cheetah™
Xi
50
To
install
the
DACT
into
the
CyberCat™
254/1016
or
Cheetah™
Xi
system
enclosures:
1.
Carefully
unpack
the
DACT
and
check
for
shipping
damage.
2.
Secure
the
four
2”
F/F
standoffs
(P/N
02
‐
11751)
onto
the
threaded
press
studs
on
the
back
of
the
enclosure,
as
shown
at
right.
The
lower
‐
right
standoff
must
be
installed
through
the
mounting
hole
provided
in
the
system
control
board.
NOTE
For
the
CyberCat™
254/1016
and
Cheetah™
Xi,
install
the
system
control
board,
then
install
the
DACT.
3.
Install
the
DACT
onto
the
standoffs
and
secure
it
in
place
by
threading
the
four
3/8”
standoffs
through
the
DACT
board
and
into
the
2”
standoffs.
DACT
Mounting
for
CyberCat™
254/1016
or
Cheetah™
Xi