If a reversing manoeuvre is required at the end of the row being tilled, the tractor p.t.o. 

must be switched off and the rotary harrow allowed to come to a complete standstill before 
it is lifted out of the ground for the manoeuvre (risk of clods of earth being hurled off by the 
tines). 

 

The cardan shaft must always be disengaged and the ignition key removed before starting 

any maintenance and repair work on the rotary harrow!

However, the following points should be observed nevertheless:

 

Maintenance  or  repair  work  must  never  be  performed  underneath  the  power  harrow 

without appropriate supports. Precautions must always be taken to prevent the machine 
from dropping inadvertently, for instance by using hoisting gear.

The power harrow should be stored in a dry place, on firm, level ground. It should be 

secured with chocks or similar objects to prevent inadvertent tilting. 

 

The power harrow type FIELDKING POWER HARROW is designed and built to require 

as little maintenance and care as possible.

All nuts, bolts and screws must be examined after the first five hours of operation and then 

always before using the machine in order to ensure that they are secure. They must be 
retightened if necessary. 

The cardan shaft must be lubricated with sufficient sulphur-free grease every eight hours 

of operation so that it can always be extended and retracted without difficulty. The bearing 
points on the cutter unit, the spindle for setting the working depth and the roller mount 
must be lubricated every 30 hours of operation. 

The oil must be checked every 20 hours of operation. 

The machine must be thoroughly cleaned before prolonged storage. Those parts which 

are in contact with the ground during operation should be sprayed with corrosion inhibitor. 

Particular attention must be paid to the condition of the tines in order to ensure maximum 

occupational safety and high-quality results. Before starting work, the tine must therefore 
be examined to ensure they are correctly secured and wear down evenly. Bent tines must 
be replaced immediately. 

Dust clouds may form when operating the power harrow at higher speeds on dry ground. 

Light respiratory protection should therefore be worn when using a tractor without closed 
driver’s cab.

4.  Maintenance, care and transport: 

 

The power harrow should always be placed on firm, level ground.

Vibrations in the power harrow are usually due to imbalances in the tine unit and may 

damage  the  machine.  Switch  off  the  power  harrow  and  the  tractor  if  the  vibrations 
increase  significantly  during  operation  or  if  the  machine’s  running  noise  changes 
suddenly. The cause must be located and remedied before resuming work.

Gear  oil  must  be  changed  after  approx.  200  hours  of  operation. A  container  must  be 

placed under the machine to collect the escaping oil and prevent contamination of the 
ground. Waste oil must be disposed of in accordance with the regulations. 

6

First switch off the tractor and remove the ignition key. 

Remove the fastening bolt and nut with a suitable wrench. 

The power harrow should only be repaired by a specialist repair shop or the FIELDKING 

customer service centre. 

 

If the tines have to be reground, care must be taken to ensure that each pair of tines in the 

tine unit is reground. This prevents the tine unit concerned becoming imbalanced.

All  faults  capable  of  impairing  safety  must  immediately  be  remedied  by  specialist 

personnel. 

The  screw  connections  between  tines  and  tine  flange  /  guard  plate  must  be  checked 

regularly. Always fit new lock nuts and new washers whenever the screw connections 
have been removed. The condition and degree of wear on the tines and tine pick-up must 
be checked regularly. 

Remember to support it so that it cannot tip over inadvertently. 

Changing and regrinding tines:

When cleaning the machine with a high-pressure cleaner, care must be taken not to direct 

the high-pressure jet against bearings and seals, as this can result in malfunctions and 
premature failure of the machine. 

Removal of the tines:

Installation of the tines:

When transporting the machine, care must be taken to ensure that there is no one and 

nothing in the immediate vicinity when sluing outwards with the tractor. 

5.  Safety instructions: 

Fit the tines in the correct order (see Fig. 2). 

The POWER HARROW may only be used when all safety mechanisms are in place and 

fully functional. 

Fit the fastening bolt, washers and nut. 

 

Tines should only be reground and changed by your dealer, since considerable hazards 

can arise if they are fitted incorrectly.

Tighten the self-locking nut twice. 

Ensure that the tines are fitted correctly in the direction of rotation. 

Disengage the cardan shaft and then the power harrow from the tractor. 

Regrinding the tines:

• 

Important: For safety reasons, new self-locking nuts and new washers must always be 

used whenever the tines are changed. 

 

Use the transport aids or three-point hitch provided on the housing to transport and handle 

the power harrow.

The operating instructions of any additional attachments installed must be read through 

carefully and observed. 

Summary of Contents for Power Harrow

Page 1: ...Operator Manual Service Manual Part Catalogue Power Harrow ...

Page 2: ...r original equipment Our trained service persons are well informed on methods required to service FIELDKING equipments and are ready to help you You have invested in one of the best implements of its type in the market today The care you give your FIELDKING implement will greatly determine your satisfaction with its performance and its service life A careful study of this manual will give you a th...

Page 3: ...ead and understand the information contained in this manual 3 Inspect the equipment and replace or repair any parts that are damaged or worn out which under continued operation would cause damage wear to other parts or cause a safety hazard 4 Return the equipment or parts to the authorized FIELDKING dealer from where it was purchased for service or replacement of defective parts that are covered b...

Page 4: ...mpairing safety must immediately be remedied by specialist personnel The power harrow may only be operated with a P T O shaft with friction clutch The power harrow may only be operated when all guards and safety mechanisms are installed and fully functional 2 The power harrow is mounted on the tractor by means of a three point linkage The gear mechanism is driven via a P T O shaft and drives the c...

Page 5: ...ft out position and mark it accordingly Shorten the inner and outer protective tube by equal amounts Then shorten the inner and outer sliding profile by the same amount as the protective tube Finally round off the cut edges and carefully remove all chips Grease the sliding profiles The tractor p t o shaft must not be switched on until it is certain that the shaft will rotate at not more than 540 r...

Page 6: ...mage the machine Switch off the power harrow and the tractor if the vibrations increase significantly during operation or if the machine s running noise changes suddenly The cause must be located and remedied before resuming work Gear oil must be changed after approx 200 hours of operation A container must be placed under the machine to collect the escaping oil and prevent contamination of the gro...

Page 7: ...ling circumstances No one may remain within 10 meters of the power harrow during operation of the machine High risk of injury due to moving machine parts and objects being hurled away from the machine such as stones etc Never climb or reach in between the power harrow and the tractor with your arms or legs during operation of the machine high risk of injury This is only permitted when the machine ...

Page 8: ...OW CAP POWER HARROW GEAR BOX SASEMBLY SOIL DEFLECTOR PLATE ASSEMBLY L SOIL DEFLECTOR PLATE ASSEMBLY R HEX HEAD BOLT CHUCK NUT ROTOR COVER 79110012 79110001 79110015 1 2 79150001 3 4 5 3 10270003 32 40 48 4 79100001 1 5 79160016 79160001 79160019 1 6 79190009 79190001 79190012 1 7 10230026 1 8 10300296 2 9 79150004 3 4 5 10 10050090 6 8 10 11 10280109 12 16 20 12 10260353 40 44 56 13 10260006 32 40...

Page 9: ...12X35X1 75MM 8 8 GRADE HALF THREAD SPRING WASHER 14MM HEX HEAD BOLT 14X50X2 MM 8 8 GRADE NYLOCK NUT M14X2 P CHUCK NUT M45X1 5P WITH NYLOCK HEX HEAD BOLT M20X85MM 79150001 2 2 79150004 2 3 10180035 5 4 79180001 1 5 79111016 1 6 79110016 1 7 10300296 5 8 10050090 4 9 79150003 5 10 10250060 1 11 79170009 1 12 10270003 24 13 10260358 1 14 10280111 1 15 79100018 1 16 79140007 1 18 10220014 1 19 7919001...

Page 10: ...11 OIL SEAL 100X60X10 2 12 HEX HEAD BOLT 10X35X1 5 MM 8 13 BEARING 33112 1 14 HEX HEAD BOLT M8X25X1 25MM 8 8 GRADE 17MM THREAD 8 15 SPRING WASHER 8MM 8 16 SPRING WASHER 10MM 8 17 CHUCK NUT 40X1 5P LEFT HAND THREAD 1 18 DIP STICK 1 19 BREATHER VALVE 1 20 INTERNAL CIRCLIP B100 4MM THIK 1 21 BEARING 32213 1 22 PINION 1 23 GEAR 1 24 BEARING 6212 2RS1 W64 1 25 CIRCLIP 110MM 1 01050026 01050025 10290076...

Page 11: ...SPRING WASHER 4 8 NYLOCK NUT 4 ANTICLOCKWISE GEAR ROTOR ASSEMBLY ANTICLOCKWISE GEAR ROTOR ASSEMBLY 16 SR NO DESCRIPTION PART NO QTY 1 GEAR ROTOR SHAFT POWER HARROW 10290077 10300296 10250061 79150003 79150002 10260358 10270005 10280005 1 2 POWER HARROW BLADES RIGHT 2 3 SPUR GEAR 24 POWER HARROW 1 4 PH CUP LOWER 1 5 PH CUP UPPER 1 6 HEX HEAD BOLT 4 7 NYLOCK NUT 4 8 SPRING WASHER 4 CLOCKWISE GEAR RO...

Page 12: ...1 HEX HEAD BOLT 42 54 66 SPRING WASHER 42 54 66 BEARING 6310 7 9 11 GASKET 185X110X1 5 7 9 11 OIL SEAL 65X85X10 7 9 11 PH ROTOR BUSH 75 ODX55 IDX24L 6 8 10 PH MAIN BUSH POWER HARROW BASE FRAME ASSEMBLY GASKET 195X155X1 5MM 7 9 11 POWER HARROW FRAME ASSEMBLY SR NO 1 1 DESCRIPTION PART NO QTY 2 1 2 3 4 5 6 7 8 9 10 11 12 11 ROTOR 7 ROTOR 78710003 79110010 11 ROTOR 9 ROTOR 7 ROTOR ...

Page 13: ... DESCRIPTION PART NO QTY 1 REAR PLANNER ASSEMBLY 79160015 1 2 PLANNER ADJUSTMENT ASSEMBLY L 79160007 1 3 PH PLANNER ADJUSMENT ASSEMBLY R 79160014 1 4 THREADED ROD 79160008 2 5 ROD HANDLE 79160009 2 19 1 3 2 4 5 REAR PLANNER ADJUSTMENT ASSEMBLY ...

Page 14: ...INT FOR INNER TUBE HALF FEMALE GUARD ASSEMBLY HALF MALE GUARD ASSEMBLY HALF FEMALE SHAFT HALF MALE SHAFT 10310037 2 3 4 5 10310092 10310092 6 10310091 10310091 7 8 9 10 11 12 13 10310047 10310047 14 15 16 17 18 19 20 21 10310056 22 23 10310051 10310051 24 10310050 PTO SHAFT Sr No DESCRIPTION PART CODE 540 RPM 1000 RPM CUT FULL CUT FULL 10310059 10310060 10310083 10310084 10310050 25 26 10310095 10...

Page 15: ...stomer s Name Address State Postcode Phone Fax Email Delivery Person I confirm that all of the delivery checks were explained and performed Signature Delivery Date Comments 1 The customer or person responsible has been given the operator s manual 2 Customer Delivery Checklist 5 The customer agrees that it is his responsibility to read and carry out the safety maintenance and operation as per this ...

Page 16: ...ILE NO Email NAME OF IMPLEMENT MODEL NO YEAR OF Mfg SERIAL NO REGISTRATION NO DATE OF PURCHASING NAME OF DEALER Corporate Office Plot No 235 236 238 240 Sec 3 HSIIDC Karnal 132001 Haryana India 91 184 2221571 72 73 marketing fieldking com exports fieldking com www fieldking com Beri Udyog Pvt Ltd 9001 2015 ...

Page 17: ...LE NO Email NAME OF IMPLEMENT MODEL NO YEAR OF Mfg SERIAL NO REGISTRATION NO DATE OF PURCHASING NAME OF DEALER Corporate Office Plot No 235 236 238 240 Sec 3 HSIIDC Karnal 132001 Haryana India 91 184 2221571 72 73 marketing fieldking com exports fieldking com www fieldking com Beri Udyog Pvt Ltd 9001 2015 ...

Reviews: