www.fi eldcontrols.com
Please retain these instructions after installation.
This device
MUST
be installed by a qualifi ed agency in accordance with the manufacturer's installation instructions. The defi nition of
a qualifi ed agency is: any individual, fi rm, corporation or company which either in person or through a representative is engaged
in, and is responsible for, the installation and operation of HVAC appliances, who is experienced in such work, familiar with all the
precautions required, and has complied with all the requirements of the authority having jurisdiction.
READ THESE INSTRUCTIONS CAREFULLY AND COMPLETELY BEFORE PROCEEDING WITH THE INSTALLATION.
Installation Date:
Installed By:
Phone:
24 VAC SYSTEM CONTROL KIT
Designed for use with the SWG Series Power Venter for controlling Natural Gas or L.P. Gas draft induced
appliances with a 24 VAC Gas Valve and a 30-millivolt controlled Natural or L.P. Gas Water Heater.
ITEMS INCLUDED IN KIT:
1- Junction box with mounted pressure switch and post purge timer
1- Fan control gas pressure switch with built in post purge option
1- 2 ft. length of
1
⁄
4
" aluminum tubing
1-
1
⁄
8
" NPT x 3" pipe nipple
1-
1
⁄
8
" NPT x
1
⁄
4
" OD tubing elbow
1-
1
⁄
8
" NPT pipe tee
1- TCA-1 Thermocouple Adaptor
1- 6 ft. length of 12-2 wire
1- 8" jumper wire
2- Flexible conduit connector
2- GSK-3 Spillage Switch
1- 4" MG1 Barometric Draft Control
1-
1
⁄
4
" tubing connector
Model: CK-91FV
P/N 46285300 Rev F 01/18