background image

SecurLAN

®

 Optical Cutoff Switch Installation

Applic

ation N

ot

e

o

peratIon

This section outlines steps for connecting and operating the Optical Cutoff Switch with 

the SecurLAN system.

c

onnectIng

 

to

 

the

 o

utput

 r

elay

 M

odule

 (orM)

To connect the Optical Cutoff Switch to the ORM:

1.  C6-15 VDC from an external power supply to Pin 1 of the Optical Cutoff 

Switch.

2.  Connect the negative lead of the power supply to Pin 2 of the Optical Cutoff 

Switch.

3.  Select a relay on the ORM to use for activating the Optical Cutoff Switch.  Keep

-

ing track of the relay number, connect the common pin (“COM”) of the ORM 

relay to Pin 2 (ground) of the Optical Cutoff Switch.

4.  Connect the normally-open pin of the ORM to 

Pin  (“Input 3”)

 of the Optical 

Cutoff Switch.

Figure 3 - 

Wiring up the Optical Cutoff Switch

Optical Cutoff Switch 

connection points

Summary of Contents for SecurLAN

Page 1: ...pting the flow of data through the compromised cable but certain configurations of the switch are also capable of re routing data to a secured cable Introduction The SecurLAN Optical Cutoff Switch is...

Page 2: ...ed Figure 2 The Optical Cutoff Switch The Optical Cutoff Switch has 3 general configurations A 1x1 switch with one pair of direct input to output ports A 2x2 switch with a dual pair of direct input to...

Page 3: ...low 6 VDC the normally closed Optical Cutoff Switch opens disrupting the optical data flow Input voltage over the 15 volt limit damages the switch Note If the 15 volt maximum limit is exceeded the sta...

Page 4: ...the Input pin on the rear panel of the Optical Cutoff Switch Placing a ground on this pin shunts power away from the internal optical switch causing the internal switch to open and halt the flow of d...

Page 5: ...er supply to Pin 1 of the Optical Cutoff Switch 2 Connect the negative lead of the power supply to Pin 2 of the Optical Cutoff Switch 3 Select a relay on the ORM to use for activating the Optical Cuto...

Page 6: ...4 Optical Cutoff Switch Input Truth Table The maximum wiring distance between the power supply and the Optical Cutoff Switch is 15 meters 50 feet assuming 22 AWG 8 conductor shielded cable is used On...

Page 7: ...SecurLAN Optical Cutoff Switch Installation Application Note Figure 4 Optical Cutoff Switch Wiring Diagram...

Page 8: ...sing the Optical Cutoff Switch option with the SecurLAN system please contact Fiber SenSys sales or technical support team directly at 1 503 692 4430 or by email at info fibersensys com 2925 NW Alocle...

Reviews: