![Fiamma Rubine RCF-PRESTO52-3B Series User Manual Download Page 5](http://html1.mh-extra.com/html/fiamma/rubine-rcf-presto52-3b-series/rubine-rcf-presto52-3b-series_user-manual_2286045005.webp)
Motor Shaft
Sha Motor
电机接头
Hanging Tube
Rod Besi
接头罩
Safety Cable
DawaiKeselamatan
钢丝绳
Screws
Skru
螺丝
Hanging Tube
Rod Besi
吊杆
Bolt
Bolt
螺栓
4
STEP 1 (See Diagram 1)
LANGKAH
1 (Rujuk Gambar 1)
骤 1(图 1)
1) Before installation, remove the rubber wheel from
both side of the hanging tube.
Sebelum pemasangan, keluarkan roda getah, plug plastik
dan semua skru / bolt dari kedua-dua belah rod besi.
在
前,把胶轮处的横栓和吊杆
的两侧横栓拆
。
STEP 2 (See Diagram 2)
LANGKAH
2 (Rujuk Gambar 2)
骤 2(图 2)
1) Insert the hanging tube through top canopy and coupling cover.
Masukkan rod besi melalui sengkuap atas dan sengkuap bawah.
吊杆
吊
和
头盖。
2)
Thread the safety cable and lead wire from the fan motor though the hanging tube. Place
the lead wire and safety cable out the top of hanging tube.
Tembuskan wayar elektrik utama dan dawai keselamatan melalui dan keluar dari bahagian atas rod besi.
全钢丝绳和电线
过吊杆,把
全钢丝绳和电源线
吊杆顶
。
3)
Insert the hanging tube into the motor and aligning holes to the motor coupling.
Masukkan rod besi ke dalam shaft motor dan selaraskan kedua-dua lubang rod besi dengan lubang
shaft.
吊杆插
电机
头处,吊杆孔
头孔
。
4)
Screw the hanging tube to motor with the previous bolt, washer, nut and R-pin.
Pasang and ketatkan rod besi pada motor dengan menggunakan bolt, sesendal, nat dan pin-R yang
dikeluarkan sebelum ini.
前从吊杆拆来的
栓、平介、
R 销
吊杆锁紧
吊头处并锁紧
丝。
DIAGRAM 2/GAMBAR 2 /图 2
Top canopy
SengkuapAtas
吊 盅
Summary of Contents for Rubine RCF-PRESTO52-3B Series
Page 1: ...用户手册 ...
Page 14: ......