Fiamma INFINITY MQRB5143BK Installation Instructions Manual Download Page 37

 

37

Optional Glass Ember Installation  

If you wish to use this media evenly spread the glass embers onto the false bottom and burner. 

Ensure the glass embers do not excessively overlap as this will affect the flame pattern. 

 

 

 

 

 

 

 

Use care when placing glass embers near the pilot area so as not block or have the glass fall over the 
crossover holes from the pilot to the burner, as delayed ignition can occur. 
The following types of glass are approved (Use of any other type other than listed below can alter the 
performance of the unit and is not covered under warranty.): 

Note:

 Use only 1/2” glass material on the burner. 

 

½” Ember Glass Material from American Fireglass.  

Maximum amount for MQRB5143: Natural Gas is 10 lbs, Propane units 5 lbs. 

Maximum amount for MQRB6961: Natural Gas is 20 lbs, Propane units 10 lbs. 

 

Liquid Glass from Firegear. 

Maximum amount for MQRB5143: Natural gas is 10 lbs, not recommended for Propane appliances. 

Maximum amount for MQRB6961: Natural gas is 20 lbs, not recommended for Propane appliances. 

 

Discoloration of glass media may occur if placed on the burner, this is not covered under warranty. 

 

Summary of Contents for INFINITY MQRB5143BK

Page 1: ...not touch any electrical switch Do not use any phone in your building Immediately call your gas supplier from a neighbour s phone If you cannot reach your gas supplier call the fire department This appliance is only for use with the type of gas indicated on the rating plate This appliance is not convertible for use with other gases unless a certified kit is used WARNING If the information in these...

Page 2: ... Combustible Enclosure Heights 16 Surround Dimensions MQRB5143 17 Surround Clearances MQRB5143 17 MQRB5143 Facing Material Requirements 18 MQRB5143 Mantel Clearances 19 Clearance to Combustibles MQRB5143 19 MQRB6961 Framing Your Gas Fireplace 20 Stand off Locations 20 MQRB6961 Locating Your Appliance 21 MQRB6961 Fireplace Dimensions 21 MQRB5143 MQRB6961 Nailing Tab Guide 22 MQRB6961 See Thru Frami...

Page 3: ...ontrol System 43 Burner System Maintenance 43 Gas Conversion for Top Convertible Pilot Series 019065X 44 MQRB5143 Burner Section Gas Conversion 45 MQRB5143 Burner Tube Removal 46 MQRB5143 Burner System Removal Installation Guide 46 MQRB5143 Moving Valve to Other Side of Fireplace 47 MQRB6961 Burner Section Gas Conversion 48 MQRB6961 Burner Tube Removal 49 MQRB6961 Burner System Removal Installatio...

Page 4: ...r View Kit Required for each unit 70 Infinite Wall Surround Covers 50 1 4 W X 19 70 Infinite Wall Surround Covers 55 3 4 W X 24 70 Infinite Porcelain Liners 70 Rocks Logs 70 Door Glass 70 Replacement Burner Assembly 71 Conversion Kit 71 Venting Accessories 71 MQRB6961 Parts List 72 Choose Your View Kit Required for each unit 72 Infinite Wall Surround Covers 69 1 8 W X 19 72 Infinite Wall Surround ...

Page 5: ... and a 5 minute cool down between each Be aware during log and firebox paint curing that a white deposit may be developing on the inside of the glass doors It is important to remove this white deposit from the glass doors with an appropriate cleaner such as Windex or a commercial fireplace glass cleaner to prevent build up Babies small children pregnant women and pets should leave the area during ...

Page 6: ...1LP MAY BE INSTALLED IN MANUFACTURED MOBILE HOMES Please follow the current ANSI NFPA 70 National Electrical Code in the USA and CAN CSA C22 1 Canadian National Electrical Code in Canada An appliance must be grounded to the steel chassis of the home with 8ga copper wire using a serrated or star washer to penetrate paint or protective coating to insure grounding Use carriage bolt at the attachment ...

Page 7: ...ard removed for servicing an appliance must be replaced prior to operating the appliance 15 Installation and repair should be done by a qualified service person The appliance should be inspected before use and at least annually by a professional service person More frequent cleaning may be required due to excessive lint from carpeting bedding material et cetera It is imperative that control compar...

Page 8: ... shall be located in the room that houses the appliance or equipment and shall Be powered by the same electrical circuit as the appliance or equipment such that only one service switch services both the appliance and the carbon monoxide detector Have battery back up power Meet ANSI UL 2034 Standards and comply with NFPA 720 2005 Edition and Have been approved and listed by a Nationally Recognized ...

Page 9: ...ghts page 5 A Hearth is not required for this unit Certified for installation in a bedroom or bedsitting room In Canada must be installed with listed millivolt thermostat In USA see local codes Stand off Locations Make note of where the stand off locations are These stand offs are provided as indicators to illustrate the boundaries for framing Therefore no framing material is permitted to extend b...

Page 10: ...10 MQRB5143 Locating Your Appliance All units are Factory Set for a Left Hand Burner System Right Hand Burner System Requires Valve to be relocated to right side of unit MQRB5143 Fireplace Dimensions ...

Page 11: ...erials e g Tile around Fireplace Note If using Optional Surround Maximum Thickness for Non Combustible Material is 3 4 Framing Flush with Face of Fireplace Fireplace to be covered with Non Combustibles e g Concrete Board for Flat Wall appearance Note If using Optional Surround Maximum Thickness for Non Combustible Material is 3 4 Qty 2 Nailing Tabs are located on each corner of the fireplace Steel...

Page 12: ...ile or the Framing will be flush with the face of the fireplace Flat Wall appearance Note If using Optional Surround Maximum Thickness for Non Combustible Material is 3 4 Continued 15 3 8 Dimension is for Wall Surface Flush with Unit on Both Sides Add 1 2 to this Dimension for each side where a non combustible wall surface will cover the unit See Nailing Tab Guide Page Also 15 3 8 Framing Style sh...

Page 13: ...raming Flush With Face of Fireplace Note If using Optional Surround Maximum Thickness for Non Combustible Material is 3 4 See the Nailing Tab Guide and MQRB5143SK MQRB6961SK pages before placing unit into the framed opening Steel Stud Framing Shown ...

Page 14: ...uch as tile or the Framing will be flush with the face of the fireplace Flat Wall appearance Note If using optional surround maximum thickness for non combustible material is 3 4 Continued Framing Style shown is for illustration purposes only This structure is NOT load bearing 17 Min 17 Min Dimension is for Wall Surface Flush with fireplace Add 1 2 to this Dimension where a non combustible wall su...

Page 15: ...raming Flush With Face of Fireplace Note If using Optional Surround Maximum Thickness for Non Combustible Material is 3 4 See the Nailing Tab Guide and MQRB5143BK MQRB6961BK pages before placing unit into the framed opening Steel Stud Framing Shown ...

Page 16: ...nstalled over vapor barrier and insulation material to prevent direct contact with the appliance See Thru or Single Sided Installation Single Side Installation Only Steel Stud Framing Shown Steel Stud Framing Shown MQRB5143 The Wall Thimble Shield Z57WTS is required in All Enclosures below 72 Seventy Two Inches Place Wall Thimble Shield Z57WTS against the Wall Thimble Immediately above the Vent In...

Page 17: ... 1 thick with a 3 4 space behind the frame When using Surrounds Maximum Thickness for Non Combustible Facing Materials is 3 4 The Fireplace may be covered up to within 1 2 of the Fireplace Opening with non combustible materials Surround Clearances MQRB5143 ...

Page 18: ... the same for all Models 5143N 5143NE 5143LP 5143LPE Note If using Optional Surround See Surround Clearances Section Steel Stud Framing Shown Steel Stud Framing Shown Note Do not drive excessively long screws into the face of the unit as internal parts may be damaged ...

Page 19: ... 0 0cm Minimum Ceiling Height from bottom of fireplace 60 Top from Stand offs 0 0cm Top of 90 Bend under 72 Enclosure 5 With Wall Thimble Shield Z57WTS All Vent Systems Top of 90 Bend over 72 Enclosure 4 All Vent Systems Top of Horizontal Pipe 2 All Vent Systems Side Bottom of Horizontal Pipe 1 All Vent Systems Vertical Vent Pipe 1 All Vent Systems Vertical Vent Pipe 1 Simpson AmeriVent Selkirk Di...

Page 20: ...le Enclosure Heights page 5 A Hearth is not required for this unit Certified for installation in a bedroom or bedsitting room In Canada must be installed with listed millivolt thermostat In USA see local codes Stand off Locations Make note of where the stand off locations are These stand offs are provided as indicators to illustrate the boundaries for framing Therefore no framing material is permi...

Page 21: ...21 MQRB6961 Locating Your Appliance All units are Factory Set for a Left Hand Burner System Right Hand Burner System Requires Valve to be relocated to right side of unit MQRB6961 Fireplace Dimensions ...

Page 22: ...erials e g Tile around Fireplace Note If using Optional Surround Maximum Thickness for Non Combustible Material is 3 4 Framing Flush with Face of Fireplace Fireplace to be covered with Non Combustibles e g Concrete Board for Flat Wall appearance Note If using Optional Surround Maximum Thickness for Non Combustible Material is 3 4 Qty 2 Nailing Tabs are located on each corner of the fireplace Steel...

Page 23: ...h the face of the fireplace Flat Wall appearance Note If using optional surround maximum thickness for non combustible material is 3 4 Continued Framed Opening 71 1 2 x 45 1 2 Framing style shown is for illustration purposes only This structure is NOT load bearing Fireplace vent MUST maintain min 1 clearance from combustible Wood framing However if steel stud framing is used 1 vent clearance is no...

Page 24: ...Flush With Face of Fireplace Note If using Optional Surround Maximum Thickness for Non Combustible Material is 3 4 See the Nailing Tab Guide and MQRB5143SK MQRB6961SK pages before placing unit into the framed opening Steel Stud Framing Shown 19 3 8 20 3 8 ...

Page 25: ...mum thickness for non combustible material is 3 4 Continued 21 Min Dimension is for Wall Surface Flush with fireplace Add 1 2 to this Dimension where a non combustible wall surface will cover the unit See Nailing Tab Guide Page also 21 Min Framed Opening 71 1 2 x 45 1 2 Framing Style shown is for illustration purposes only This structure is NOT load bearing Fireplace vent MUST maintain min 1 clear...

Page 26: ...Flush With Face of Fireplace Note If using Optional Surround Maximum Thickness for Non Combustible Material is 3 4 See the Nailing Tab Guide and MQRB5143BK MQRB6961BK pages before placing unit into the framed opening Steel Stud Framing Shown 21 1 4 20 3 4 ...

Page 27: ...stalled over vapor barrier and insulation material to prevent direct contact with the appliance See Thru or Single Sided Installation Single Side Installation Only Steel Stud Framing Shown Steel Stud Framing Shown MQRB6961 The Wall Thimble Shield Z57WTS is required in All Enclosures below 78 Seventy Eight Inches Place Wall Thimble Shield Z57WTS against the Wall Thimble Immediately above the Vent I...

Page 28: ... 1 thick with a 3 4 space behind the frame When using Surrounds Maximum Thickness for Non Combustible Facing Materials is 3 4 The Fireplace may be covered up to within 1 2 of the Fireplace Opening with non combustible materials Surround Clearances MQRB6961 ...

Page 29: ...same for all Models 6961N 6961NE 6961LP 6961LPE Note If using Optional Surround MQRB6961 See Surround Clearances Section Steel Stud Framing Shown Steel Stud Framing Shown Note Do not drive excessively long screws into the face of the unit as internal parts may be damaged ...

Page 30: ...om of fireplace 64 Vertical 68 Horizontal See MQRB6961 Combustible Enclosure Heights page Top from Stand offs 0 0cm Top of 90 Bend under 78 Enclosure 6 1 2 With Wall Thimble Shield Z57WTS All Vent Systems Top of 90 Bend over 78 Enclosure 6 1 2 All Vent Systems Top of Horizontal Pipe 2 All Vent Systems Side Bottom of Horizontal Pipe 1 All Vent Systems Vertical Vent Pipe 1 All Vent Systems Vertical ...

Page 31: ...nto framed opening you must install the Firebox Cover and the Heat Shield Assembly onto the back of the unit The remaining parts of this kit can be installed after the fireplace is installed into the framed opening Do Not Overtighten or Strip Screws Apply a small bead of Millpac to Firebox Cover Gasket before Installation Continued Warning Failure to position the parts in accordance with these dia...

Page 32: ... Tube 4 Place End Panels on top of the False Bottom and tilt into place at either end of the Firebox Replace the Liner Clips 5 Place the bottom of the door into the door retainer slot and then secure the door with the top latches See Door and Glass Information in manual if more information is required 6 To locate Valve Access Cover engage the tabs into the slots in the Access Panel Brackets on the...

Page 33: ... Assembly using the DT Screws provided 3 End Panels Remove the Liner Retainer Clips in the Firebox Top Place End Panels into Firebox on top of the False Bottom and tilt into place at either end of the Firebox Replace the Liner Retainer Clips 4 Door Place the bottom of the door into the door retainer slot and then secure the door with the top latches See Door and Glass Information in manual if more...

Page 34: ...in place of the Side Fillers so long as the total amount of material applied is not thicker than 1 1 2 on the inside of the fireplace opening This will allow for removal of the Glass Door Access Panel Using the Optional Surrounds The Surround Frames are 1 1 2 4 wide and 1 thick with a space behind the frame The Fireplace may be covered up to within of the opening with non combustible materials up ...

Page 35: ...re surround can be installed 3 Remove Glass Door from fireplace 4 Hook lower ledge of Surround Frame onto the Lower Front Face Panel of the fireplace With top of Frame tilted outward slide Side Fillers behind Surround Frame 5 Push Surround Frame into place and install using the existing screw holes in the tile lip Front Edge of the Side Filler must rest between Surround Frame and Fireplace see fig...

Page 36: ...wo additional screws may be added to MQRB5019SS and MQRB5624SS to counteract heat distortion Directions 1 Install Surround normally as per Instructions 2 Drill a pilot hole through the unused slot in each corner of the inner top of the surround 3 Insert Screw ...

Page 37: ... any other type other than listed below can alter the performance of the unit and is not covered under warranty Note Use only 1 2 glass material on the burner Ember Glass Material from American Fireglass Maximum amount for MQRB5143 Natural Gas is 10 lbs Propane units 5 lbs Maximum amount for MQRB6961 Natural Gas is 20 lbs Propane units 10 lbs Liquid Glass from Firegear Maximum amount for MQRB5143 ...

Page 38: ...llection Natural MQRB5143 or MQRB6961 MQRock3 30pc Rock Set Contemporary Collection Multi Colored MQRBD1 or MQRBD2 Driftwood and Rock Kit Place rocks and logs onto False Bottom randomly as shown Be careful not to cover any part of the Burner Tube as sooting may occur MQ Rock2 or 3 30pc Rock Set Place rocks randomly onto False Bottom as shown Be careful not to cover any part of the Burner Tube as s...

Page 39: ... on the glass Let the silicone dry for approximately 15 20minutes Use caution when removing broken glass Wear gloves Removal of the Glass Door 1 Remove the door by unlatching the 2 top latches Simply place 2 fingers in the grooves and pull and lift upward slightly 2 Once the top of the door is unlatched tilt the door forward and lift upward to release the bottom 3 When re installing the door place...

Page 40: ...ble Lower Face Panel Installers Note Once the installation is complete attach the Lower Face Panel Insert two 2 screws on each side and seven 7 screws at the bottom of the Lower Face Panel Place on the Valve Access Cover The Lower Face Panel must be on the unit Before Facing Materials are applied Lower Ledge of Lower Face Panel Must be Under the Fireplace Surround will not fit otherwise Note Once ...

Reviews: