FEZIBO Desktops 48 Assembly Instruction Manual Download Page 3

2

On a padded or carpeted area, take all of the items out 

of your FEZIBO frame box and confirm that nothing is 

missing. Reference the included parts listings on page 3.

Before starting

Specs

Tools Needed

Phillips Screw Driver

Electric Drill

(Not Included)

(Not Included)

Elecrtic control part:

1. Input Voltage: 100-240Vac 50/60Hz

2. Duty cycle: 10%MAX 2min on 18min off

Desk frame part:

1. Dynamic load: 60KG / 132Lbs

2. The maximum static load: 80KG / 176Lbs

Safety warning

Please read this manual carefully before use.
1. Indoor use only.

2. The product must be connected to the correct power supply.

3. For any accessories connected to the control box, the plug type

     and electrical characteristics must conform to its specifications.

4. If the transformer's external cable is damaged and need to be

     replaced,new accessory will be provided by the manufacturer or

     its service agent. 

Summary of Contents for Desktops 48

Page 1: ...ASSEMBLY INSTRUCTION For Assembly assistance email service fezibo com For Use With FEZIBO Desktops 48 and larger...

Page 2: ...s electric shock and voids any warranty claims Placing objects taller than 20 underneath the desk will obstruct the desk s movement and may result in physical damage Using a voltage converter could ca...

Page 3: ...y cycle 10 MAX 2min on 18min o Desk frame part 1 Dynamic load 60KG 132Lbs 2 The maximum static load 80KG 176Lbs Safety warning Please read this manual carefully before use 1 Indoor use only 2 The prod...

Page 4: ...ox Strap N Connection K Medium Machine H Handset E Sync Rod C Foot x 2 Clip x 10 O Cable M6 x 10 L Small Machine I Power Adapter F Side Bracket x 2 x28 For63 x22 For48 Screw x26 For55 A Lifting Colum...

Page 5: ...Assembly Step 1 Step 2 4 M5 C Foot x 2 M4 M6 x 10 B Lifting Colum with Gerabox A Lifting Colum D Crossbar Checklist Checklist L Small Machine M8 x 8 K Medium Machine B A C K C M5 M4 D L...

Page 6: ...M4 Step 3 Step 4 5 E Sync Rod M2 5 F Side Bracket x 2 Checklist Checklist M2 5 LOOSEN M2 5 TIGHTEN E F F M4 M6 x 10 L Small Machine...

Page 7: ...Step 5 6 M2 5 N N N N N N N J Checklist N Connection Screw J Medium Wood R Bolt For 48 N N N R x6 R x5 For 55 For 63 x5 For48 x6 For55 63 Strap x3 For48 55 x4 For63 x6 For48 55 x8 For63 R x6...

Page 8: ...Step 6 Step 7 7 Screw x10 J Medium Wood Checklist Checklist Q Q Tabletop x 2 Please make sure the Part E sync is facing you H H Handset Screw x2 M Small Wood J...

Page 9: ...Step 8 8 I G P P P G Power Cable I Power Adapter Screw x2 J Medium Wood Checklist...

Page 10: ...wer Unplug and replug the cable of hand set Anticollision alert desktop sloping check the desktop Connection cable failure Check the connecting cable controller fault Exchange the controller motor fau...

Page 11: ...sement height Long pressing desk running hands o desk stop running 0 1 8 0 Metric 1 Inch S 2 S 3 S 4 S 5 S 6 S 8 0 shut down 1 The most insensitive 8 The most sensitive 0 shut down 1 The most insensit...

Page 12: ...ister your FEZIBO product to confirm your warranty It only takes a few simple steps and then you can access a wide range of services such as technical support new product alert promotions and warranty...

Reviews: