![Fetco Extractor TBS-2121 User Manual Download Page 5](http://html1.mh-extra.com/html/fetco/extractor-tbs-2121/extractor-tbs-2121_user-manual_2285237005.webp)
5
Installation
(For Qualified Service Technicians Only)
Guide to A Successful Installation
If not installed correctly by qualified personnel, the brewer will not operate properly and damage may result.
Damages resulting from improper installation are not covered by the warranty, and will void the warranty.
Here are the key points to consider before installation:
Electrical:
All FETCO brewers require
an electrical ground wire
. Installation without grounding is dangerous.
Verify voltages, polarity, circuits, and circuit breaker access before attaching equipment.
The electrical diagram is located in the Users Guide and online at www.fetco.com.
The installation must comply with applicable federal, state, and local codes having jurisdiction at your
location. Check with your local inspectors to determine what codes will apply.
Plumbing:
All installations must comply with applicable federal, state, or local plumbing codes.
An inline water filter is highly recommended. It should be installed after a water shutoff valve and in a
position to facilitate filter replacement.
The water line and newly installed filter cartridge must be flushed thoroughly prior to connecting it to the
brewer to prevent debris from contaminating the machine.
Verify that the water line will provide a flow rate of 1½gpm/ (5.7lpm) per minute and water pressure is
between 35-50 psig (241-345kPa) before making any connections. A pressure regulator may be
required
Install a backflow prevention device if required. Many municipalities require a recognized backflow
preventer. Usable on all hot beverage and cold beverage equipment is a WATTS® SD-2 or SD-3.
These spring loaded double check valve models are accepted by most zoning authorities.
The check valve should be as close to the water supply inlet of the beverage equipment as possible.
General:
Utilize only qualified beverage equipment service
technicians for installation.
A Service Company Directory is available at
www.fetco.com
.
Utility slide
on back
of brewer
Power
Switch
[Optional]
B.I.B.
Connector
for
Sweetener
Water
Supply
Connection
Power Cord