Fetco Extractor TBS-2121 User Manual Download Page 5

5

Installation 

(For Qualified Service Technicians Only) 

Guide to A Successful Installation 

If not installed correctly by qualified personnel, the brewer will not operate properly and damage may result.   
Damages resulting from improper installation are not covered by the warranty, and will void the warranty. 
Here are the key points to consider before installation: 

Electrical:  

™

  All FETCO brewers require 

an electrical ground wire

.  Installation without grounding is dangerous. 

™

  Verify voltages, polarity, circuits, and circuit breaker access before attaching equipment. 

™

  The electrical diagram is located in the Users Guide and online at www.fetco.com. 

™

  The installation must comply with applicable federal, state, and local codes having jurisdiction at your 

location.  Check with your local inspectors to determine what codes will apply. 

Plumbing:  

™

  All installations must comply with applicable federal, state, or local plumbing codes. 

™

  An inline water filter is highly recommended.  It should be installed after a water shutoff valve and in a 

position to facilitate filter replacement. 

™

  The water line and newly installed filter cartridge must be flushed thoroughly prior to connecting it to the 

brewer to prevent debris from contaminating the machine. 

™

  Verify that the water line will provide a flow rate of 1½gpm/ (5.7lpm) per minute and water pressure is 

between 35-50 psig (241-345kPa) before making any connections. A pressure regulator may be 
required 

™

  Install a backflow prevention device if required.  Many municipalities require a recognized backflow 

preventer.  Usable on all hot beverage and cold beverage equipment is a WATTS® SD-2 or SD-3.  
These spring loaded double check valve models are accepted by most zoning authorities.   
The check valve should be as close to the water supply inlet of the beverage equipment as possible.  

General: 

™

  Utilize only qualified beverage equipment service 

™

   technicians for installation.   

A Service Company Directory is available at 

www.fetco.com

Utility slide 

on back 

of brewer

Power 

Switch

[Optional] 

B.I.B. 

Connector 

for 

Sweetener 

Water 

Supply 

Connection

Power Cord

Summary of Contents for Extractor TBS-2121

Page 1: ...eparately Table of Contents Contact Information 2 Description Features 2 Specifications 3 Requirements 3 Weights Capacities and Measurements 3 Electrical Configuration and Brewing Efficiency 3 Install...

Page 2: ...n cycle Expandable separately available base platform system Using these variables the software calculates how much water to use for prewetting brewing and dilution The total brew time is divided into...

Page 3: ...e subject to change by FETCO without notice Weights Capacities and Measurements Electrical Configuration and Brewing Efficiency Designs materials specifications physical dimensions firmware and softwa...

Page 4: ...4 Dimensions Utility Connections Rough in drawings Rough in TBS 2121 shown with two ITD 2135 3 5 gallon Dual Slim dispensers Utility Connections TBS 2121...

Page 5: ...er is highly recommended It should be installed after a water shutoff valve and in a position to facilitate filter replacement The water line and newly installed filter cartridge must be flushed thoro...

Page 6: ...peration of the TBS 2121 Always schedule changing water filters per the manufactures specification 7 Unit was calibrated to a stable non fluctuating water supply at 45 psi Unit may require a pressure...

Page 7: ...located on the lower right of the back of the equipment 3 The water tank will begin filling FETCO Home Screen 1 will read FILLING 4 When the water level rises and is sensed by the probe at the top of...

Page 8: ...h and hold screen Switch TBS 2121 power OFF Turn main power switch to ON The touch screen will illuminate Immediately touch and hold finger to enter programming In 5 8 seconds PROGRAMMING screen will...

Page 9: ...Clean dispensers with hot suds water and a brush rinse and air dry 4 Use only a soft cloth and hot suds on the outside surfaces to avoid scratches Never use abrasives which will scratch surface Weekl...

Page 10: ...2 Add tea leaves approximately 3oz per single 3 gallon brew batch Weights given are only suggested 3 Insert loaded brewbasket into brewer rails and position handle Brewbasket s must be in place 4 Pos...

Page 11: ...rted Ready TBS_2121 Heating Filling 2013 all rights reserved Touch screen to unlock READY SCREEN Tap screen to display menus R1 11 35 9 22 F 200 2 43 Drip out mode If dilution and sweetener is not act...

Page 12: ...he individual programming items shown below Programming Category Programming Category Programming Category Programming Category Programming Category PROGRAM GENERAL INPUTS OUTPUTS OTHER Items for Prog...

Page 13: ...ON OFF ON ON __ _______________ ON OFF Batch Summary Display Summary Batch Name L 1 Choose from list L 1 Regular 1 16 OR Write any name Extract Vol 3 80 liter 0 40 11 35 3 80 liter ______ ___________...

Page 14: ...S BREW AT TEMP AUTO DEFAULT FACTORY PROGRAMMED INTO BREWER This allows the BREW START to active If the hot water tank is at the selected temperature the brew will start If the temperature is too low t...

Page 15: ...test Enter volume in milliliters or gallons obtained from one minute ON testing OUTPUTS Programming Items Factory set Default Programming Range display Notes Dispense Valve D Valve Test Press to test...

Page 16: ...r and Screen To access these with the 2nd level highlighted as shown scroll through the positions with the right and left arrows Scroll down to D Valve Test In this programming position the following...

Page 17: ...sure ________________ ____ YES NO Completely overwrites all user setup incl user logo All Counters Counters Display Counters OR Reset Counters Counters Display Total Counters L Brews L Brew Act Left...

Page 18: ...tions Replace probe if necessary 201 Heater open high limit thermostat or Solid State Relay SSR fault if temperature does not rise at least 2 Celsius within 20 minutes probably heater circuit is open...

Page 19: ...abrasives To sanitize the dispenser before filling brew a batch of water only no tea into the dispenser allow it to rest for 10 minutes and drain Repeat daily or as needed We recommend Urnex Tabz Tea...

Page 20: ...ER FAUCET SHANK 6 1 1013 00078 00 SCREW SHANK TEA DISPENSER 7 1 1071 00045 00 C RING FOR TEA FAUCET 8 1 1071 00047 00 FAUCET TEA DISPENSER 9 1 1071 00046 00 PLASTIC WING NUT 10 4 1023 00175 00 BUMPER...

Page 21: ...rts are subject to change without notice FETCO TBS 2121 Iced Tea Brewing System With Sweetener Delivery Complete Commercial Parts Listing For FETCO TBS 2121and FETCO TBS 2121 S Model Range NEW June 20...

Page 22: ...22 Parts diagrams bill of materials lists Drawing 1101 00142 00 TBS 2121 Assembly No Sweetener...

Page 23: ...2121 19 1 1024 00059 00 GASKET_FRONT_4A 20 1 1102 00201 00 ASSEMBLY FRONT PANEL TBS 2121 21 1 1024 00040 00 CARD PLUG HWD 2100 22 4 1021 00018 00 LEG TBS 2121 23 2 1084 00024 00 NUT CLIP ON J NUT 6 3...

Page 24: ...T GROMMET DESIGN 8 1 1003 00140 00 ALUMINUM BRACKET FOR SSR 9 1 1052 00014 00 ASSEMBLY RELAY SOLID STATE 25A 230V 10 1 1003 00005 00 BRACKET ONE SHOT THERMOSTAT 11 1 1053 00004 00 THERMOSTAT SINGLE SH...

Page 25: ...00182 00 BREW BASKET TBS 2121 2 1 1024 00060 00 SILICONE STRAINER 3 1 1023 00179 00 NUT BREW BASKET ORIFICE HOLDER 4 1 1023 00185 00 ORIFICE SET OF 7 BREW BASKET TBS 2121 5 1 1023 00180 00 BLUE BREW B...

Page 26: ...26 Wiring diagrams...

Page 27: ...27...

Reviews: