background image

P155            REV:003                

April - 2017 

4

Instructions for Operating the CBS-2121 Pour Over Coffee Brewer 

 

AFTER UNPACKING: DO NOT PLUG IN THE BREWER   

See 

Installing the CBS-2121 Pour Over Coffee Brewer 

on previous page 

 

COFFEE BREWING:  
1. Insert a filter into the brew basket  
2. Pour fresh ground coffee into the filter-distributing it evenly. 
   -Start with using 1-4 ounces of ground coffee, for a full brew. 
   -(3.5-4.0 ounces regular ground coffee was used for factory calibration) 
3. Slide the brew basket completely into the upper rails.  
4. Place an empty dispenser beneath the prepared brew basket 

prior to pouring in fresh water

.  

5. Brewer is prepared to brew when “READY” light is on 
6. Pour one container or carafe of fresh water into the screened area on top of the brewer. 
    (Container is the measure of a standard serving carafe = 64 fl.oz/1.9L) 
7. After brewing is finished: dispose of the used filter and grounds and rinse the brew basket 

Typical brew time approximately five minutes—4 minutes pour-in time & brew with 1 minute drip time 
 
 

 

 

1. Insert a filter into the basket and pour fresh coffee 
into filter. – Start with using 1-4 ounces of coffee 
2. Level the bed of grounds  
3. Slide the basket completely into the upper rails.  
4. Place an empty dispenser beneath the basket 

prior to adding fresh water.

 

5. Begin brew when “READY” light is lit 
6. Pour one container (up to 64 fl.oz/1.9L of fresh water) 
into the screened area on top of the brewer.  
7. When brewing is completed, dispose of used filter & 
grounds and rinse the brew basket. 
-Typical brew cycle is approximately five minutes 

Summary of Contents for CBS-2121P

Page 1: ...719 3000 Fax 847 719 3001 Email sales fetco com techsupport fetco com P155 rev003 APRIL 2017 www fetco com User s Guide and Operator Instructions FETCO Pour Over Coffee Brewer Models CBS 2121P CBS 212...

Page 2: ...EMA 5 15P plug C212102 None 200 240 Volts 1 46 2 10 8 3 9 6 CEE 7 7 PLUG C212112 Two 200 240 Volts 1 53 2 20 9 2 10 4 CEE 7 7 PLUG For 64 fl oz 1 9 L Total brew time with final drip out approximately...

Page 3: ...ts or 192 fl oz This indicates that the tank is full and primed for brewing 6 Plug the power cord into the electrical outlet 7 Allow the brewer to heat up to full temperature indicated by the READY li...

Page 4: ...er or carafe of fresh water into the screened area on top of the brewer Container is the measure of a standard serving carafe 64 fl oz 1 9L 7 After brewing is finished dispose of the used filter and g...

Page 5: ...must be performed by the manufacturer or authorized service personnel with the specified cord only from the manufacturer in order to avoid a hazard 9 The appliance must be disconnected from its power...

Page 6: ...EW TUBE Using the FETCO 18 1085 00012 00 Descaling Spring Remove spray head use a towel or heavy gloves to prevent burning as spray head may be hot Insert descaling spring for at least 2 3 of its leng...

Page 7: ...tude installation Thermostatic control of the hot water tank temperature is factory set to the maximum temperature 93 C 200 F and is adjustable to the lowest setting of 82 C 180 F The capillary thermo...

Page 8: ...P155 REV 003 April 2017 8 PARTS DIAGRAM...

Page 9: ...1 1058 00053 00 LED INDICATOR LIGHT GREEN 230VAC 22 2 1025 00118 00 SPACER TUBE FRONT PANEL 23 4 1082 00115 00 SCREW 6 x 3 8 LG SLOTED HEX HD WASHER 24 1 1058 00045 00 SWITCH POWER DP 16A ALL MODELS...

Page 10: ...P155 REV 003 April 2017 10 Wiring Diagrams CBS 2121 Universal Version Drawing 1401 00137 00 CBS 2121 CE Version Drawing 1401 00140 00...

Reviews: