1. Installation CPV−DI02 and CPV−CS02
1−15
Festo P.BE−CPV−DI02−EN en 0704NH
1
.
3
Connectin
g
the
f
ie
ld
bus
1.3.1
Field bus cable
Note
If installation has not been carried out correctly and if high
baud rates are used, data transmission errors may occur
as a result of signal reflections and attenuations.
Causes of the transmission faults can be:
missing or incorrect terminating resistor
incorrect screening/shield connection
branches
transmission over long distances
unsuitable cables.
Observe the cable specifications. Refer to your controller
manual for information on the type of cable to be used.
Note
If the valve terminal is fitted into a moving part of a
machine, the field bus cable on the moving part must be
provided with strain relief. Note the relevant regulations in
IEC/DIN EN 60204−1.
Summary of Contents for PROFIBUD-DP
Page 2: ......
Page 15: ...Installation CPV DI02 and CPV CS02 1 1 Festo P BE CPV DI02 EN en 0704NH Chapter 1...
Page 58: ...1 Installation CPV DI02 and CPV CS02 1 44 Festo P BE CPV DI02 EN en 0704NH...
Page 59: ...Commissioning CPV DI02 PROFIBUS DP 2 1 Festo P BE CPV DI02 EN en 0704NH Chapter 2...
Page 79: ...Diagnosis CPV DI02 PROFIBUS DP 3 1 Festo P BE CPV DI02 EN en 0704NH Chapter 3...
Page 107: ...Commissioning CPV CS02 ABB CS31 4 1 Festo P BE CPV DI02 EN en 0704NH Chapter 4...
Page 116: ...4 Commissioning CPV CS02 ABB CS31 4 10 Festo P BE CPV DI02 EN en 0704NH...
Page 117: ...Diagnosis CPV CS02 ABB CS31 5 1 Festo P BE CPV DI02 EN en 0704NH Chapter 5...
Page 131: ...Technical appendix A 1 Festo P BE CPV DI02 EN en 0704NH Appendix A...
Page 146: ...A Technical appendix A 16 Festo P BE CPV DI02 EN en 0704NH...
Page 147: ...Index B 1 Festo P BE CPV DI02 EN en 0704NH Appendix B...
Page 148: ...B Index B 2 Festo P BE CPV DI02 EN en 0704NH Contents B Index B 1...
Page 154: ...B Index C 8 Festo P BE CPV DI02 EN en 0704NH...