background image

Festo PDAD-…-SP-12000 1611c English I 23

8.  Loosen the screw of the reservoir seal 

6

 using a hex key (SW 5).

9.  Pull the entire cartridge module out of 

the reservoir using the handle on the 
lid 

8

.

10.  Remove the lid 

8

 by unscrewing the 

screw of the reservoir seal 

6

.

11.  Dispose of the plastic disc 

7

, the two 

large O-rings 

9

 and the used desiccant 

cartridge 

aA

 in compliance with the 

local waste disposal stipulations.

12.  Re-assemble the cartridge module with 

the new desiccant cartridge 

aA

, the two 

large O-rings 

9

 and the plastic disc 

7

 

from the service package. 
Lightly screw in the screw of the 
reservoir seal 

6

.

6

8

6

7

8

9

aJ

9

aA

Summary of Contents for PDAD-09-SP-12000

Page 1: ... de Montage anleitung en Assembly instructions 8063399 1611c 8063400 Servicepaket Service package PDAD SP 12000 ...

Page 2: ...inbau und Inbetriebnahme nur von qualifiziertem Fachpersonal gemäß Montageanleitung Installation and commissioning are to be carried out only by qualified personnel in accordance with the assembly instructions Deutsch 3 English 17 ...

Page 3: ...verzeichnis 1 Einführung 4 2 Sicherheit 5 3 Außerbetriebnahme 7 4 Austausch der Trockenmittelkartuschen 8 4 1 Abdeckung demontieren 12 4 2 Schalldämpfer tauschen 13 4 3 Abdeckung montieren 14 5 Inbetriebnahme 15 6 Rücksetzung des Steuergeräts 16 ...

Page 4: ...artuschen 3 Inberiebnahme 4 Rücksetzung des Steuergeräts Weitere Informationen zum Adsorptionstrockner PDAD entnehmen Sie bitte der Bedienungsanleitung die dem Gerät beigelegt ist Lieferumfang Servicepaket PDAD 09 13 22 51 73 PDAD 100 2 Trockenmittelkartuschen 4 Kunststoffscheiben 6 O Ringe groß 4 O Ringe klein 1 Reset Scheibe 1 Schalldämpfer 4 Trockenmittelkartuschen 8 Kunststoffscheiben 12 O Rin...

Page 5: ... für einen Benutzer oder Bedie ner des Produkts zu verringern Vorsicht Gefahrenquelle Hinweise zur Druckgeräterichtlinie Einstufung der Trockner als Druckgeräte in Kategorien Typ PDAD 09 PDAD 13 PDAD 22 PDAD 51 PDAD 73 PDAD 100 Kategorie I I I I II II Hinweise zur Inbetriebnahme und Wartung Schwingungen können Ermüdungserscheinungen des Werkstoffs hervorrufen und die Dauerfestigkeit der Adsorption...

Page 6: ...andere Personen einer Gefahr ausgesetzt Das Gerät außer Betrieb zu nehmen bedeutet Trennung von der Spannungsversorgung Trennung von der Druck luftversorgung und vollständiger Druckabbau Nur Originalersatzteile und zubehör vom Hersteller verwenden Es gibt keine Garantie dass nicht originale Ersatzteile so konstruiert und hergestellt wurden dass sie den Sicherheits und Betriebsanforderungen des Ger...

Page 7: ...eßende Luft nicht getrocknet wird 2 Ventil B schließen 3 Ventil A schließen 4 Trockner zum vollständigen Druck abbau 15 Minuten lang laufen lassen 5 Trockner von jeglicher Strom versorgung trennen Die Funktion der Trockenmittelkartuschen kann versagen Sicherstellen dass bei längerer Unterbrechung der Stromzufuhr keine Druckluft am Adsorptions trockner anliegt C D A B ...

Page 8: ... zwi schen Feinstfilter und Trockner Diese Teile werden für den Zusammenbau wieder benötigt 3 Beide Befestigungsschauben Abdeck blech 2 PZ 2 lösen und Abdeckblech entfernen 4 Die 4 Befestigungsschrauben des Druck behälters 3 mit einem Inbusschlüssel SW 5 leicht lösen 5 Die 4 Befestigungsschrauben des Mehrwege Verteilers 4 SW 5 mit je 3 ganzen Umdrehungen lösen 6 Die 4 Befestigungsschrauben des Dru...

Page 9: ...der Schraube Behälterabdichtung 6 entfernen 11 Kunststoffscheibe 7 die 2 großen O Ringe 9 und die alte Trockenmittel kartusche aA entsorgen in Übereinstimmung mit den örtlichen Abfall bestim mun gen 12 Kartuschenbaugruppe mit neuer Trockenmittelkartusche aA 2 großen O Ringen 9 und Kunststoffscheibe 7 aus dem Servicepaket wieder zusammen montieren Dabei die Schraube Behälterabdich tung 6 leicht ein...

Page 10: ...am unteren Ventilblock platzieren 16 Druckbehälter im Trockner platzieren Achten Sie dabei auf richtigen Sitz des Druckbehälters Der Druckbehälter muss passend an den Ventilblöcken anliegen 17 Die 4 Befestigungsschrauben des Druck behälters 3 so weit eindrehen bis der Druckbehälter sicher befestigt ist Schrauben jedoch noch nicht fest anziehen 18 Schritte 6 bis 17 wiederholen bis alle Trockenmitte...

Page 11: ...ehältern 3 fest anziehen Das Anziehdrehmoment beträgt 20 Nm 21 Abdeckblech mit beiden Befestigungs schrauben 2 befestigen Das Anzieh drehmoment beträgt 1 Nm 22 Ggf Feinstfilter am Trockner montieren siehe Bedienungsanleitung 23 Trockner wieder in Betrieb nehmen siehe Kapitel 5 Inbetriebnahme 24 Steuergerät mit der Reset Scheibe aus dem Servicepaket rücksetzen siehe Bedienungsanleitung 3 3 2 4 ...

Page 12: ... 1611c Deutsch 4 1 Abdeckung demontieren 1 Außerbetriebnahme durchführen siehe Kapitel 3 Außerbetriebnahme Trockner ohne Abdeckung 2 Befestigungsschraube SW 4 ent fernen 3 Abdeckung nach außen ziehen und nach unten wegnehmen ...

Page 13: ...re und hintere nur beim PDAD 100 Abdeckung des Trockners entfernen 2 Schalldämpfer vom Ventilblock drehen und aus dem Trockner entnehmen 4 2 Schalldämpfer tauschen 3 Neuen Schalldämpfer im Trockner auf Ventilblock schrauben und handfest anziehen ...

Page 14: ...sch 1 Abdeckung einsetzen dazu Einsteckfeder an der Abdeckung in die Nut des Trockners platzieren 2 Abdeckung nach oben schieben und nach innen drücken 3 Befestigungsschraube eindrehen Anziehdrehmoment max 1 Nm 4 3 Abdeckung montieren ...

Page 15: ...ingestellt und startet automatisch i Stromversorgungs LED POWER und Behälter LED X leuchten grün ii Nach 120 Sekunden erlischt Behälter LED X und Kondensatablass LED Z leuchtet grün Das Kondensatablassventil öffnet für ca 2 s iii Nach 50 weiteren Sekunden erlischt Kondensatablass LED Z und Behälter LED Y leuchtet grün iv Nach weiteren 120 Sekunden erlischt Behälter LED Y v Nach weiteren 50 Sekunde...

Page 16: ...Dazu wird die Reset Scheibe verwendet die im Servicepaket enthalten ist Die Scheibe 5 Sekunden lang an die blaue Stelle auf der Anzeige halten Während dieser 5 Sekunden blinkt die Stromversorgungs LED POWER Netzver sorgung grün Nach der erfolgreichen Rücksetzung blinkt die Behälter LED Y zur Bestätigung ein Mal rot Der Betriebsstundenzähler für die neuen Trokenmittelkartuschen beginnt bei 0 ...

Page 17: ...Table of contents 1 Introduction 18 2 Safety 19 3 Decommissioning 21 4 Replacing the desiccant cartridges 22 4 1 Removing the cover 26 4 2 Replacing the silencers 27 4 3 Fitting the covers 28 5 Commissioning 29 6 Resetting the controller 30 ...

Page 18: ...ng the desiccant cartridges 3 Commissioning 4 Resetting the controller Further information about the adsorption dryer PDAD can be found in the operating instructions which accompany the device Scope of delivery of the service package PDAD 09 13 22 51 73 PDAD 100 2 desiccant cartridges 4 plastic discs 6 O rings large 4 O rings small 1 reset disc 1 silencer 4 desiccant cartridges 8 plastic discs 12 ...

Page 19: ...k for the user or operator of the product Caution Source of danger Note on Pressure Equipment Directive Classification of the dryers in pressure equipment categories Type PDAD 09 PDAD 13 PDAD 22 PDAD 51 PDAD 73 PDAD 100 Category I I I I II II Notes on commissioning and maintenance Vibrations can cause fatigue in the material and can decrease the endurance limit of the adsorption dryers and mountin...

Page 20: ...her personnel are exposed to a risk if work is carried out on a running device Decommissioning the device means disconnecting it from the power supply and compressed air supply and ensuring the pressure is completely reduced Only use accessories and spare parts from the manufacturer There is no guarantee that non original spare parts are designed and manufactured to correspond to the safety and op...

Page 21: ...rough the bypass is not dried out 2 Close valve B 3 Close valve A 4 Leave the dryer to run for 15 minutes to ensure the pressure is completely reduced 5 Disconnect the device from any power supply The desiccant cartridges can fail Ensure that there is no compressed air in the adsorption dryer during longer interruptions to the power supply C D O B ...

Page 22: ...g between the micro filter and dryer These parts will be needed again for reassembly 3 Release both mounting screws on the cover plate 2 PZ 2 and remove the cover sheet 4 Slightly loosen the four mounting screws of the pressure housing 3 using a hex key SW 5 5 Release the four mounting screws of the multiple distributor 4 SW 5 with three full turns 6 Remove the four mounting screws of the reservoi...

Page 23: ...y unscrewing the screw of the reservoir seal 6 11 Dispose of the plastic disc 7 the two large O rings 9 and the used desiccant cartridge aA in compliance with the local waste disposal stipulations 12 Re assemble the cartridge module with the new desiccant cartridge aA the two large O rings 9 and the plastic disc 7 from the service package Lightly screw in the screw of the reservoir seal 6 6 8 6 7 ...

Page 24: ...ce package on both the top and bottom valve block 16 Place the reservoir in the dryer Make sure that the reservoir is properly seated The reservoir must fit tightly against the valve blocks 17 Screw in the four mounting screws of the reservoir 3 until the reservoir is securely fixed Do not yet fully tighten the screws 18 Repeat steps 6 to 17 until all desiccant cartridges have been replaced 6 aB a...

Page 25: ... the reservoir 3 The tightening torque is 20 Nm 21 Fit the cover plate using both mounting screws 2 The tightening torque is 1 Nm 22 If necessary assemble the micro filter on the dryer see operating instructions 23 Put the dryer back in operation see chapter 5 Commissioning 24 Reset the control device with the reset disc from the service package see operating instructions 3 3 2 4 ...

Page 26: ...12000 1611c English 4 1 Removing the cover 1 Decommissioning the dryer see chapter 3 Decommissioning Dryers without covers 2 Remove the mounting screw SW 4 3 Pull the cover outwards and remove it by pushing it downwards ...

Page 27: ... 1 Remove the front and rear dryer covers only for PDAD 100 2 Unscrew the silencer out of the valve block and remove from the dryer 4 2 Replacing the silencers 3 Screw the new silencer on the valve block in the dryer and tighten it by hand ...

Page 28: ...1c English 1 Insert the cover placing the insertion springs on the cover into the groove of the dryer 2 Push the cover upwards and press it inwards 3 Screw in the mounting screw tightening torque max 1 Nm 4 3 Fitting the covers ...

Page 29: ...ply LED POWER and reservoir LED X light up green ii After 120 seconds the reservoir LED X goes out and the condensate outlet LED Z lights up green The condensate drain valve opens for approx two seconds iii After a further 50 seconds the condensate drain LED Z goes out and the reservoir LED Y lights up green iv After a further 120 seconds the reservoir LED Y goes out v After a further 50 seconds t...

Page 30: ...ust be reset using the reset disc in the service package The disc must be held for five seconds on the blue part of the display During these five seconds the power supply LED POWER network supply flashes green After a successful reset the reservoir LED Y flashes red once as confirmation The operating hour counter for the nine desiccant cartridges starts at 0 ...

Page 31: ...Festo PDAD SP 12000 1611c English I 31 ...

Page 32: ...reproduction distribution and utilisation of this document as well as the communication of its contents to others without express authorisation is prohibited Offenders will be held liable for the payment of damages All rights reserved in the event that a patent utility model or design patent is registered Copyright Festo AG Co KG PO box D 73726 Esslingen Germany Phone 49 711 347 0 Fax 49 711 347 2...

Reviews: