background image

6

Commissioning

To start up the device, proceed as follows:
1. Apply operating pressure p1.
2. Switch on the supply voltage.

The output pressure p2 is built up slowly. The filling time “t” is set through the
flow control screw attached to the cover. The output pressure rises correspond-
ing to the set throttle point (

Fig. 12). If the preset pressure switching point

(PSP) is reached, the main seat of the valve opens (

Fig. 13). The MS9-SV-...-C

is then ready for operation.

No further settings are required.

Tamper protection

To prevent a manipulation of the settings, setting and control elements can be
equipped with a cover

11 Accessories.

7

Operation

Note

Exhaust with a voltage drop

8

Maintenance and care

• Switch off the following sources of energy before cleaning the exterior of the

device:
– Operating voltage
– Compressed air

• If needed, clean the MS9-SV-...-C from outside.
Soap suds (max. +50 °C), petroleum ether and all non-abrasive cleaning agents
may be used.

9

Disassembly

Note

Residual pressure must be eliminated.

1. Switch off the following sources of energy before dismantling:

– Operating voltage
– Compressed air

2. Separate the respective connections from the MS9-SV-...-C.

10

De-commissioning and disposal

In coordination with the waste management company, the product can be com-

pletely disposed of through metal recycling (e.g. EAK 17 04 02). If necessary, the

solenoid valve is dismantled and disposed of separately in electronic scrap recyc-

ling (EAK 16 02 16).

11

Accessories

Designation

Type

Silencer

U-1-B

Cover

1)

MS9-SV-C-MH

Cover

2)

MS9-SV-C-MK

1)

covers the manual override

2)

covers pressure switching point, main throttle and manual override

Fig. 8

Accessories

Festo accessories can be found at:

www.festo.com/catalogue

12

Troubleshooting

Malfunction

Possible cause

Remedy

Valve switches abruptly

Pressure switching point too
low, flow control valve opened
too wide

Correct settings

Valve does not switch

Pressure switching point too
high, flow control valve not
opened widely enough

Correct settings

Fig. 9

Troubleshooting

13

Technical data

13.1 Safety-related characteristics

MS9-SV

-10V24P

-V24

-V110

-V230

Safety function

Venting

Performance Level (PL)

Venting: up to category 1, PL c

Max. pos. test pulse at logic 0

[µs]

3800

3200

Max. neg. test pulse at logic 1

[µs]

4900

2800

Venting time

[s]

13.5 Venting time

CE marking (see declaration of conformity)

To EU Low Voltage Dir-
ective

Fig. 10 Safety-related characteristics

13.2 General data

MS9-SV

-10V24P

-V24

-V110

-V230

Pneumatic connection 1

with accessories (connection sizes

Fig. 2)

Pneumatic connection 2

with accessories (connection sizes

Fig. 2)

Pneumatic connection 3

G1

NPT1

Type of mounting

In-line installation

With accessories

Mounting position

Any

Design

Piston slide

Actuation type

Electric

Exhaust function

No flow control

Type of control

Piloted

Valve function

3/2-way valve, monostably closed, pressure built-
up function adjustable

Operating medium

Compressed air to ISO 8573-1:2010 [7:4:4]

Note on operating medium

Operation with lubricated medium possible (in
which case lubricated operation will always be re-
quired)

Operating pressure p1

[bar]

3.5 … 16

Pressure switching point

[bar]

adjustable

diagram Fig. 13

Venting flow rate

adjustable through flow control valve

diagram

Fig. 12

C-value 1

}

2

[l/(s*bar)]

-3/4:

57.61

-1

69.59

-AGD:

31.43

-AGE:

54.24

-AGF

68.24

-AGG

68.45

-AGH

66.07

C-value 2

}

3

[l/(s*bar)]

-3/4:

55.52

-1

54.01

-AGD:

56.22

-AGE:

54.07

-AGF

52.73

-AGG

51.06

-AGH

51.36

b-value 1

}

2

-3/4:

0.37

-1

0.32

-AGD:

0.47

-AGE:

0.37

-AGF

0.34

-AGG

0.35

-AGH

0.35

b-value 2

}

3

-3/4:

0.49

-1

0.46

-AGD:

0.60

-AGE:

0.49

-AGF

0.47

-AGG

0.45

-AGH

0.44

Standard nominal flow rate
1

}

2

[l/min]

-3/4/-N3/4: 14150

-1/-N1

16460

-AGD/-AQR: 8300

-AGE/-AQS:

13250

-AGF/-AQT:

16340

-AGG/-AQU: 16550

-AGH/-AQV: 15910

Standard flow rate 2

}

3

[l/min]

-3/4:

14790

-1

14140

-N3/4:

14900

-N1

14100

-AGD/-AQR: 16500

-AGE/-AQS:

14400

-AGF/-AQT:

13800

-AGG/-AQU: 13200

-AGH/-AQV: 13200

Ambient temperature

[°C]

0 … +60 (0 … +50 with pressure sensor)

Temperature of medium

[°C]

0 … +60 (0 … +50 with pressure sensor)

Storage temperature

[°C]

0 … +60 (0 … +50 with pressure sensor)

Shock resistance

Shock test with severity level 1 according to
FN 942017-5 and EN 60068-2-27

Vibration resistance

Transport application test with severity level 1 to
FN 942017-4 and EN 60068-2-6

Summary of Contents for MS9-SV-10V24P

Page 1: ... in accordance with EN 175301 10V24P 24 V DC M12 in accordance with IEC 61076 2 101 V110 110 V AC connection arrangement in accordance with EN 175301 V230 230 V AC connection arrangement in accordance with EN 175301 Options S Silencer Tamper protection MH Cover only manual override MO MK Cover adjusting screws pressure switching point PSP and main throttle MT manual override MO Fig 2 Overview of v...

Page 2: ...omponents Fig 4 Standards 3 5 Service Please consult your local Festo repair service if you have any technical problems 4 Mounting and installation 4 1 Mechanical Note Information about mounting of module connectors sub bases and mounting brackets can be found in the operating instructions enclosed with the relevant accessories Place the MS9 SV C as close as possible to the location of use Place t...

Page 3: ...ig 9 Troubleshooting 13 Technical data 13 1 Safety related characteristics MS9 SV 10V24P V24 V110 V230 Safety function Venting Performance Level PL Venting up to category 1 PL c Max pos test pulse at logic 0 µs 3800 3200 Max neg test pulse at logic 1 µs 4900 2800 Venting time s 13 5 Venting time CE marking see declaration of conformity To EU Low Voltage Dir ective Fig 10 Safety related characteris...

Page 4: ...tle MT located in the cover a slower pressure build up of output pressure p2 is achieved If the output pressure p2 has reached the switch through pressure the valve opens and the complete operating pressure p1 builds up at the output The pressure switching point can be set by turning the adjusting screw for the pressure switching point PSP 1 2 1 PSP maximum 2 PSP minimum Fig 13 Pressure switching ...

Reviews: