Work out together with the participants the general steps of Installation.The
conditions for this example shall be:
•
the PLC-board is removed
•
no power supply connection, no air-pressure supply
•
the Control Panel is removed
1. check the adjustment of mechanical components
2. check the adjustment of mechanical actuators holder
3. check the PLC-modules
4. assemble removed components (like PLC-board and Control Panel)
5. cable connections (PLC-board, Control Panel, communication)
6. connect all power supplies
7. check the adjustment of sensor holders
8. check the adjustment of sensors in the holders
9. check the adjustment of sensitivity of sensor
10. tubing connections
11. connect all air-pressure supplies (careful! turn pressure down before)
12. check the adjustment of the speed of pneumatic actuators
13. connect the stations together
14. check the mechanical position of hand over to the next station
15. communication connection
Planning
Please plan your activities within your team. Check first, which actuator could be
moved by hand and which not-use the technical documentation-pneumatic plan.
Check the inputs in the wiring diagram and at the PLC. Check the adjustment of the
sensors first, then the mechanical and pneumatical elements and.
The time to finish this project should be around 3,0 hour.
Summary of Contents for MPS 2000
Page 1: ... Festo Didactic GmbH Co MPS 1 Handling Station MPS 2000 Instructors Edition ...
Page 14: ...Commissioning 12 Festo Didactic GmbH Co MPS Execution Documentation ...
Page 34: ...Commissioning 32 Festo Didactic GmbH Co MPS ...
Page 37: ...Programming Festo Didactic GmbH Co MPS 35 Insert à Station à SIMATIC 300 Station ...
Page 38: ...Programming 36 Festo Didactic GmbH Co MPS P2_01 à SIMATIC 300 1 à Hardware double click ...
Page 39: ...Programming Festo Didactic GmbH Co MPS 37 SIMATIC 300 à RACK 300 à Rail à double click ...
Page 44: ...Programming 42 Festo Didactic GmbH Co MPS SIMATIC 300 à Station à Save and Compile ...
Page 50: ...Programming 48 Festo Didactic GmbH Co MPS ...
Page 56: ...Programming 54 Festo Didactic GmbH Co MPS X close the project P2_01 ...
Page 57: ...Programming Festo Didactic GmbH Co MPS 55 P2_02 à Insert à Program à S7 Program ...
Page 65: ...Programming Festo Didactic GmbH Co MPS 63 ...
Page 69: ...Programming Festo Didactic GmbH Co MPS 67 ...
Page 71: ...Programming Festo Didactic GmbH Co MPS 69 Program FC1 ...
Page 74: ...Programming 72 Festo Didactic GmbH Co MPS Execution Documentation Program OB1 ...
Page 79: ...Programming Festo Didactic GmbH Co MPS 77 Execution Documentation Program OB1 ...
Page 84: ...Programming 82 Festo Didactic GmbH Co MPS CPU 314 right mouse button à Paste ...
Page 87: ...Programming Festo Didactic GmbH Co MPS 85 New structure of the project ...
Page 89: ...Programming Festo Didactic GmbH Co MPS 87 Program FC1 ...
Page 94: ...Programming 92 Festo Didactic GmbH Co MPS Program FC1 ...
Page 105: ...Programming Festo Didactic GmbH Co MPS 103 ...
Page 108: ...Programming 106 Festo Didactic GmbH Co MPS ...
Page 109: ...Programming Festo Didactic GmbH Co MPS 107 ...
Page 110: ...Programming 108 Festo Didactic GmbH Co MPS ...
Page 116: ...Programming 114 Festo Didactic GmbH Co MPS Execution Documentation ...
Page 118: ...Programming 116 Festo Didactic GmbH Co MPS ...
Page 119: ...Programming Festo Didactic GmbH Co MPS 117 ...
Page 123: ...Programming Festo Didactic GmbH Co MPS 121 ...
Page 124: ...Programming 122 Festo Didactic GmbH Co MPS ...
Page 125: ...Programming Festo Didactic GmbH Co MPS 123 ...
Page 126: ...Programming 124 Festo Didactic GmbH Co MPS ...
Page 127: ...Programming Festo Didactic GmbH Co MPS 125 ...
Page 128: ...Programming 126 Festo Didactic GmbH Co MPS ...
Page 129: ...Programming Festo Didactic GmbH Co MPS 127 ...
Page 130: ...Programming 128 Festo Didactic GmbH Co MPS ...
Page 131: ...Programming Festo Didactic GmbH Co MPS 129 ...
Page 132: ...Programming 130 Festo Didactic GmbH Co MPS ...
Page 133: ...Programming Festo Didactic GmbH Co MPS 131 ...
Page 134: ...Programming 132 Festo Didactic GmbH Co MPS ...
Page 135: ...Programming Festo Didactic GmbH Co MPS 133 ...
Page 136: ...Programming 134 Festo Didactic GmbH Co MPS ...
Page 139: ...Trouble Shooting Festo Didactic GmbH Co MPS 137 Error Project 2 2 ...
Page 141: ...Trouble Shooting Festo Didactic GmbH Co MPS 139 Error Project 2 3 ...
Page 143: ...Trouble Shooting Festo Didactic GmbH Co MPS 141 Error Project 2 4 ...
Page 145: ...Trouble Shooting Festo Didactic GmbH Co MPS 143 Error Project 2 5 ...
Page 147: ...Trouble Shooting Festo Didactic GmbH Co MPS 145 Error Project 2 6 ...
Page 149: ...Trouble Shooting Festo Didactic GmbH Co MPS 147 Error Project 2 7 ...
Page 151: ...Trouble Shooting Festo Didactic GmbH Co MPS 149 Error Project 2 8 ...
Page 153: ...Trouble Shooting Festo Didactic GmbH Co MPS 151 Error Project 2 9 ...
Page 155: ...Trouble Shooting Festo Didactic GmbH Co MPS 153 Error Project 2 10 ...
Page 157: ...Trouble Shooting Festo Didactic GmbH Co MPS 155 Error Project 2 11 ...
Page 159: ...Trouble Shooting Festo Didactic GmbH Co MPS 157 Error Project 2 12 ...
Page 161: ...Trouble Shooting Festo Didactic GmbH Co MPS 159 Error Project 2 13 ...
Page 163: ...Trouble Shooting Festo Didactic GmbH Co MPS 161 ...
Page 164: ...Trouble Shooting 162 Festo Didactic GmbH Co MPS ...
Page 165: ...Trouble Shooting Festo Didactic GmbH Co MPS 163 Error in Project ...