2. Commissioning
2−38
Festo P.BE−CPX−FB23−EN en 0308NH
2.3
Commissioning the CPX terminal on the field bus
In order to avoid faults (e.g. configuration and parametrizing
faults) during commissioning:
·
Observe the general commissioning instructions in the
CPX system.
·
Check the DIL switch settings before using and replacing
CPX terminals.
·
Check the configured address range (number of stations).
If necessary, test the I/Os.
·
Check the address assignment of the I/Os on the CPX
terminal.
Summary of Contents for CPX-FB23
Page 2: ......
Page 4: ...Contents and general instructions II Festo P BE CPX FB23 EN en 0308NH...
Page 15: ...Installation 1 1 Festo P BE CPX FB23 EN en 0308NH Chapter 1...
Page 45: ...Commissioning 2 1 Festo P BE CPX FB23 EN en 0308NH Chapter 2...
Page 86: ...2 Commissioning 2 42 Festo P BE CPX FB23 EN en 0308NH...
Page 87: ...Diagnosis and error treatment 3 1 Festo P BE CPX FB23 EN en 0308NH Chapter 3...
Page 104: ...3 Diagnosis and error treatment 3 18 Festo P BE CPX FB23 EN en 0308NH...
Page 105: ...Technical appendix A 1 Festo P BE CPX FB23 EN en 0308NH Appendix A...
Page 117: ...Index B 1 Festo P BE CPX FB23 EN en 0308NH Appendix B...
Page 118: ...B Index B 2 Festo P BE CPX FB23 EN en 0308NH Contents B Index B 1 B 1 Index B 3...