Festo CPV10-VI-P Series Assembly Instructions Download Page 2

1.

 

Parts list 

       P2            P4             P6             P8 

 

9053d_1 

 

9053d_3 

 

9053d_11 

 

1

    Multi-pin 

CPV10-VI-P..-M7-D 

2

    Multi-pin 

CPV10-VI-P..-M7-C 

3

    Seals 

CPV10-VI-P.M7 

2.

 

Preparing for fitting 

 

9053d_5 und 9053d_12 

 

 

Note the dimensions of 
the cut-out for fitting (see 
table). 

In order to comply with 
protection class IP65. 

 

Make sure that the sur-
face near the sealing sur-
face: 

 

is flat. 

 

is free of marks and scrat-
ches. 

 

9053d_2 

 

Mounting cut-out for  
CPV10-VI-P..-M7-D 

1

 

 

Type A 

_

 0.1 

_

 0.1 

_

 0.1 

_

 0.1 

CPV10-VI-P..-M7-D 

1

 

P2 29  22  40  8 

P4 29  42  40  28  4 
P6 

29 62 40 48 6 

P8 29  82  40  68  6 

 

 

9053d_4 

 

Mounting cut-out for  
CPV10-VI-P..-M7-C 

2

 

 

Type A 

_

 0.1 

_

 0.1 

_

 0.1 

_

 0.1 

CPV10-VI-P..-M7-C 

2

 

P2 53  59  64  62  6 
P4 53  79  64  82  6 
P6 53  99  64  102  6 
P8 53  119  64  122  6 

 

3.

 

Fitting 

 

9053d_6 

 

 

Press all the seals 

3

 

supplied into the holes in 
the CPV valve terminal. 

 

Note that the 3 and 4-part 
seals supplied with the 
end plates of the CPV 
valve terminal are only re-
quired with Multi-pin 

2

 

type CPV10-…-C. 

 

9053d_7 

 

 

Place the Multi-pin 

1

 or 

2

 in the mounting cut-out 

from inside. 

 

9053d_8 

 

 

 

9053d_9 

 

 

Fasten the Multi-pin 

1

 or 

2

 with N x M5 corrosion-

resistant screws as per 
DIN EN ISO 4762. 

 

Select the screw length l 
as follows. A screw depth 
of at least 7.5 mm to max. 
9.5 mm must be guaran-
teed. 

 

9053d_10 

 

 

Tighten screws. Note here 
the permitted tightening 
torque. 

 
 
 

Assembly instructions (en) 
688 719 / 2006-06NH 

 

 

 

†‡

 

Multi-pin 
CPV10-VI-P.. 

 

 

Festo AG & Co. KG 

 
Postfach 
73726 Esslingen 
++49/(0)711/347-0 
www.festo.com 

 

1

 / 

1

 / 

M

A

 = 4.5 – 5.5 Nm 

l – t = > 7.5mm < 9.5 mm 

Reviews: